
GSB User Manual
GSB User Manual (593-01940-01 Rev C)
release date: TBD
Page 5 of 27
Temperature operation range: -40 to +60
°
C
GSB LED provides information about unit state, errors and charging
process, useful during deployment and pick-up operations
Charging the internal battery requires as little as one hour for every 10
days of deployment
Light weight 1 Kg (1 or 3 channels models)
2.
–
GSB data downloader and charger
The GSB racks provide an interface to download data and charge the internal
battery. The racks are 12 slots modular. There are two types of racks available to
be used with the GSBs:
•
Portable
for small crew operation or to be used in remote sites.
•
GSB trailer
for normal operations.
2.1
–
Portable chargers and data retrieval
The portable charger can charge internal battery and retrieve seismic data from up
to 24 GSBs simultaneously.