Digging a 2,50m deep trench with 2% slope
Method 2: Using surveyor stake as reference
Set the slope:
1. Short-
press “%”
2. Dial-in 2.00% using
„Up“
3. Confirm with
„Enter“
Set the reference:
1. Place the tip of the bucket on the surveyor stake
2. Short-
press “0”
Set the depth:
1. Short-
press „Elevation“
2. Dial-in -2.50 using
„Down“
3. Confirm with
„Enter“
Same as when digging a horizontal reference, the LCD
screen and the LED display will indicate the difference of
your bucket tip to the reference
Summary of Contents for EZDig
Page 1: ...Manual Version 1 00 Software Version 1 00 User Manual Applications Language English...
Page 7: ...Digging a hole Method 1 Using the ground as reference...
Page 9: ...Digging a 2 50m deep hole Method 2 Using surveyor stake as reference 2 50m Surveyor Stake...
Page 11: ...Digging a 2 50m deep by 5m wide hole 5m Surveyor Stake 2 50m...
Page 17: ...Digging a trench with 2 slope Method 1 Using the ground as reference...
Page 26: ...Digging a 1 1 sloped embankment...
Page 30: ...Changing the elevation Method 1 Working with a rotating laser 0 10m 4 71m 4 61m...
Page 32: ......