59/64
© Geobrugg AG, Switzerland
RXE-8000
13
Final inspection / Inspección final / Inspeção final
Once installation has been completed, the following aspects in particular must be inspected:
a)
Are the support ropes and the lateral rope connected to the correct anchors?
b)
Are the rope guides at the top and bottom of the posts installed correctly?
c)
Have the correct number of loops been left free on the left and right of the posts?
d)
Is the net correctly fastened to the support ropes?
e)
Have the correct number of wire rope clips been attached to the ends of the rope?
f)
Are the wire rope clips installed correctly?
g)
Has the correct torque been applied to the wire rope clips?
h)
Are the nets connected correctly?
i)
Are the end nets correctly fastened to the vertical ropes?
j)
Is the sag of the top support rope less than 3% of the distance between the posts?
Please consider the maintenance manual.
Summary of Contents for RXE-8000
Page 2: ...Notes Notas Notas 2 64 Geobrugg AG Switzerland RXE 8000...
Page 10: ...Notes Notas Notas 10 64 Geobrugg AG Switzerland RXE 8000...
Page 21: ...Notes Notas Notas 21 64 Geobrugg AG Switzerland RXE 8000...
Page 27: ...27 64 Geobrugg AG Switzerland RXE 8000 h 9 m h 10 m h 10 5 m...
Page 35: ...Notes Notas Notas 35 64 Geobrugg AG Switzerland RXE 8000...
Page 42: ...42 64 Geobrugg AG Switzerland RXE 8000 H3 H4 311 68 U2 2x A2 33 2 86 89 F1...
Page 44: ...44 64 Geobrugg AG Switzerland RXE 8000 33 2 2x J1 86 68 H4...
Page 58: ...Notes Notas Notas 58 64 Geobrugg AG Switzerland RXE 8000...
Page 62: ...62 64 Geobrugg AG Switzerland RXE 8000 14 Systemdrawing Planos del sistema Desenhos do sistema...