background image

Step 5 – Confirming connection 

1. 

On the Display, the     should now be on (this could take up to 

 

two minutes), otherwise please refer to the troubleshooting 

 

section.  The     shows that the Display is communicating with

 

the Transmitter. 

2. 

Remove the batteries from the Display and plug the power 

 

supply provided. 

 

Congratulations, the display is successfully set up and ready 

 

to use.

Step 1 – Display

1. 

During the setup place four batteries in the back of the Display. 

2.   When turned on the Solo PV displays its software version, then the
 

 ‘card in’  screen (if applicable) followed by the main screen.

3. 

Hold the middle (set) button in for 3-4 seconds until ‘set year’ is 

 

displayed. To change the year use the left and right buttons. For 

 

further information on settings refer to the user manual.

What’s in the box?

2

1

Step 2 – Transmitter 

1. 

Open the unit by pressing the button and pulling the outer 

 

cover away from the bottom.

2. 

Remove the battery tab from the Transmitter.  

3. 

The green light will flash to show that the batteries 

 

are working. 

Step 3 – LED reader placement

1. 

Find the pulse output on the meter.

2. 

Stick the velcro circle over the pulse output on the meter.

3.       Place the LED reader over the velcro circle on the meter,  
 

please make sure that the GEO logo is facing you. 

1

2

3

Step 4 – LED reader & Transmitter

1. 

Ensure the LED reader is firmly connected to the 

 

Transmitter.  Sometimes requiring a second push to make 

 

good connection.

MAC : 00 00BC00 0B0 1 0 DA0

SN : 000000000 000 00

TRANSMITTER

SOLO PV DISPLAY

DISPLAY POWER SUPPLY

LED READER

AA BATTERIES

DISPLAY STAND

SD CARD

2

3

2

4 x 1.5V AA CELLS

www.greenenergyoptions.co.uk

1

3

1

Reviews: