GentleTent GT Sky Loft Instructions Download Page 4

 

P a c k   D o w n   / /   G T   S k y   L o f t  

 

Step 1  

Deflate the nosecone first by inserting your index finger and pushing down the blue 
tab on the inside valve. Repeat this with the 3 inner supports.

 

 

Step 2 

Repeat  this  process  for  the  two  upper  tubes.  These  will  naturally  deflate  and  fold 
inwards.

 

 

Step 3  

Once the top tubes have been deflated, climb up the ladder and neatly place all the 
material on top of the platform. The neater you do this, the easier folding will be. 

 

 

Step 4  

Remove the ladder and repeat the deflation process for the base. To deflate the 
base, push and turn the inflation valve. 

 

Do this for both valves for faster deflation. There is one located on each end of the 
platform. 

 

 

 

Step 5 

Once deflated, fold the two LONGEST sides over into the centre so there is no extra 
material  bulging  over  the  edges  of  the  metal  base  and  secure  with  the  attached 
2 buckles. 

 

Then  fold  the  two  SMALLER  ends  in  to  the  centre  and  secure  with  the  attached 
buckle. 

 

Please keep in mind when folding the platform, to always fold flat and avoid any kinks 
or twists in the base. 

 

 

Step 6 

Fold the ladder and place in the centre of the packed tent, or you may place it in 
between one of the folded layers.

 

 

 

Step 7 

Zip the cover on. 

 

 
 
 

 

 

 

 

 

Summary of Contents for GT Sky Loft

Page 1: ...Camping Easier GT Sky Loft I n s t r u c t i o n s Thank you for purchasing our GT Sky Loft For an easier setup please follow these instructions Happy Camping GentleTent Australia gentletentaustralia www gentletentaustralia com au ...

Page 2: ...s on the underside of the base Be sure to turn the valve until it is protruding out before you begin inflation If you do not do this air will escape when you remove the connector after inflation Step 4 Using the supplied pump adaptor connection attach this to your 12 volt pump Push in and twist the connector into the inflation point on the base Inflate to between 8 10 psi Do not exceed 11 psi Step...

Page 3: ...t be between 3 3 5 Do not exceed 3 8 Step 11 To remove the fitting simply twist and pull making sure to close tightly with the attached cap Step 12 Once you have inflated both sides of your Sky Loft you will need to attach the 3 inner support tubes via the Velcro attachments After the initial instalment of the support tubes these can remain in place for future pack downs Inflate these 3 tubes to t...

Page 4: ...e deflation process for the base To deflate the base push and turn the inflation valve Do this for both valves for faster deflation There is one located on each end of the platform Step 5 Once deflated fold the two LONGEST sides over into the centre so there is no extra material bulging over the edges of the metal base and secure with the attached 2 buckles Then fold the two SMALLER ends in to the...

Page 5: ... into the ground as this will also help support the base of your GT Sky Loft For extra sleeping comfort we recommend using our GT mattress When deflating allow a couple of minutes for the air to naturally escape before attempting to fold the tent together We also provide an annexe attachment for extra space This zips around the base of the nosecone and surrounds the ladder However this will not fi...

Reviews: