GNMK-IMC-6072-A
Ensure both ends of each wire or cable are firmly in place.
Install and secure the structural panels to Base and Tower(s). (This should be done prior to attaching
the cabling/wiring due to risk of pulling and damaging the connections)
Attached the 3 bolts to connect the Tower(s) to the Base using the appropriate bolt (M10) and fasten
and secure the Tower(s) to the Base with an 8mm torque wrench set to 2.0 N
⋅
m or 15.0 lb
⋅
in. Visually
inspect after securing bolts to ensure Tower isn’t bent. If bent, consult Technical Support.
Note
: Tighten per the torque specification to avoid damaging the Tower.
System Leveling
Level each Tower independently and start with a Tower closest to the Base by placing the
dual axis
digital
level in each bay position (
Bubble levels are visual placeholders
ONLY
)
Figure 15 Dual axis level in empty bay slots within Tower
Level the Tower as close to 0° across all bay positions as possible in both directions by extending the
outermost 4 feet on the base and tower.
Note
: The inner feet will likely float during this step which is acceptable and will ensure entire system can
be adjusted using just the 4 outer corner feet. All floating feet will be extended during step 22.8.
Note
: For configurations with 2 Towers on a single side, level the closest Tower to the Base then level the
outer Tower. Ensure every tower is on a similar horizontal plane to each other so leveling one tower does
not adversely impact other towers. Loosening the bolts slightly may be required to adjust both towers
within level range. Make sure to re-torque the bolts after leveling is completed and recheck the level