
BLIZZARD 400-800 C ENC
30
532104 - Rev.A
- - +
OPEN A OPEN B STOP
BUS BUS
1 2 3 4 5 6
- - +
OPEN A OPEN B STOP
BUS BUS
1 2 3 4 5 6
N
L
PE
L
N
N
L
PE
L
N
1
1
2
2
SPRINT M24 MASTER
SPRINT M24 SLAVE
J6
J2
J4
J6
J2
J4
4 9
4 8
Tr
ansla
tion of the orig
inal instruc
tions
ENGLISH
9.2 BATTERY KIT
!
Disconnect the battery kit if the automation is taken out of service.
L
i
Battery kits with revision 1 are not compatible: the revision number
must be A1 or higher. Check the revision number on the label of the
battery kit board.
Recharge the battery kit by connecting it to the SPRINT M24, before
starting up the system. The full charging cycle of the battery kit is
72 hours.
The battery kit ensures that the automation is powered if there is a
mains power failure. The number of cycles that can be carried out
by the battery depends on the condition of the automation system (the
state of charge of the battery, the time elapsed since the mains power
failure, the ambient temperature, structure of the gate etc.).
1. Switch off power to the system.
2. Place the battery kit in its housing (
3. Connect the battery kit to connector J10 on the electronic board.
4. Switch on power to the system.
10. MASTER-SLAVE
If installing systems that have two opposite opening leaves, two
BLIZZARD 400-800 C ENC must be installed. The first (referred to as
the
MASTER
) controls the second (referred to as the
SLAVE
). It is up
to the installer to decide which is the
MASTER and which is the SLAVE
.
F
Cut the power to the system before making the connections.
1. Install one gearmotor for each leaf (§ 5).
2. Connect all the accessories to the
MASTER
(§ 6). The only ac-
cessory that can be connected to the
SLAVE
is the flashing light.
3. Install a pair of wires to connect the
MASTER
and
SLAVE
together
via the
Bus
. For the moment, do not connect the
MASTER
and
SLAVE
via the
Bus
.
4. Carry out the Start-up and Set-up procedure for the
MASTER
and
SLAVE
independently (§ 7).
5. Set the
Ct
=
MA
function on the
MASTER
.
6. Set the
Ct
=
SL
function on the
SLAVE
.
7. Connect the
MASTER and SLAVE
together via the
Bus
. Follow
the polarity indicated in
.
8. Carry out the final operations (§ 8).
L
i
If there is a fault, after having replaced the electronic board:
- Set the
Ct
function with the Bus line disconnected
- Connect the
MASTER
and
SLAVE
together via the
Bus
. Follow the
polarity indicated in
- Carry out the
Setup
procedure from the
MASTER:
in this way, the
Setup
procedure will also be carried out for the
SLAVE
.
Summary of Contents for BLIZZARD 400 C ENC
Page 1: ...BLIZZARD 400 C ENC BLIZZARD 800 C ENC...
Page 33: ......