Installation steps
1
First, make sure that the mainframe unit is switched off. Then locate the
available SFP slot and remove the plastic plug (if inserted).
1
2
3
4
5
6
7
8
1 MW 250Vpk
1 MW 250Vpk
1 MW 250Vpk
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
PTP
POWER OUT
11V 1.4A max
POWER OUT
11V 1.4A max
F
USES: 3.15
A
T
100-
240v
A
C
M
A
INS INPUT
CAL
I/O
PTP
PTP
B
A
Figure 11.56:
Interface/Controller SFP location
A
Interface/Controller SFP location
B
Remove cap
GEN3t
I3995-3.1 en HBM: public
219