![GENERGY TEIDE Instructions For Use Manual Download Page 53](http://html1.mh-extra.com/html/genergy/teide/teide_instructions-for-use-manual_2210922053.webp)
11
Engl
is
h
4. Checks prior to operation:
4.1 Battery connection (only electrical models with electrical startup).
The battery is provided with a
disconnected terminal. Before
connecting the battery, check that the
engine switch is in the "OFF" or "0"
position.
If you have any questions on
identifying the engine switch, check
chapter 3 (components identification).
1 Loosen the support fastening bolts for the battery, extract it and place it on a
leveled and secure surface.
2 Connect the generator supply wires on the battery terminals. Negative lead on
the negative terminal and positive lead on the positive terminal.
3 Install the battery by inverting the removal steps on the generator riser and fix
it to fastening rods.
NOTE:
Respect the cable polarities, connect the red cable (+) to the red
terminal (+) of the battery and the black cable (-) to the negative (-) of the battery.
A wrong connection could damage the electrical parts of the team and the battery.
NOTE:
Extreme precautions so as to not make unwanted contact with the
battery terminals and cables, among them or against a metallic part of the
machine.
FASTENING BOLTS
BATTERY
Summary of Contents for TEIDE
Page 2: ......
Page 42: ......
Page 82: ......
Page 122: ...Portugu s...
Page 123: ......
Page 124: ...Portugu s POLIGONO INDUSTRIAL NEINVER CALAHORRA LA RIOJA CONTACTO INFORMA ES INFO SG GROUP ES...