Operation

Automatic Transfer Switch Owner’s Manual

17

Generator Tests Under Load

1.

Set the generator main circuit breaker to OFF
(OPEN).

2.

Set the utility service disconnect circuit breaker of
the transfer switch to OFF (OPEN), and turn OFF
(OPEN) all load circuit breakers.

3.

Manually actuate the transfer switch main contacts
to the emergency (standby) position. See 

Manual

Operation

.

4.

Select MANUAL mode to start generator. Allow
engine to stabilize for a few minutes, and close lid
(if applicable).

5.

Set the generator main circuit breaker to ON
(CLOSED). The generator now powers all LOAD
circuits. Check generator operation under load as
follows:
• Turn on electrical loads to the full rated wattage/

amperage capacity of the generator. DO NOT
OVERLOAD.

• With maximum rated load applied, check voltage

and frequency across transfer switch terminals
E1 and E2. Voltage should be greater than 230
VAC (240 VAC system); frequency should be
greater than 59 Hz.

• Verify gas pressure remains within acceptable

parameters (see the generator installation man-
ual).

• Allow the generator to run under rated load for at

least 30 minutes. Observe for unusual noises,
vibration, or overheating that might indicate a
problem.

6.

Set generator main circuit breaker to OFF (OPEN)
when checkout under load is complete.

7.

Allow generator to run at no-load for several min-
utes. Then shut down by selecting OFF.

8.

Move main switch contacts to utility position. 

NOTE: 

See 

Manual Operation

. Handle and operating

lever of transfer switch should be DOWN.

9.

Set transfer switch utility service disconnect circuit
breaker to ON (CLOSED).

The system is now set for fully automatic operation.

Checking Automatic Operation

Proceed as follows to check system for proper automatic
operation:

1.

Verify generator is OFF.

2.

Set transfer switch utility service disconnect circuit
breaker to OFF (OPEN).

3.

Verify switch is de-energized.

4.

Install front cover of the transfer switch.

5.

Set transfer switch utility service disconnect circuit
breaker to ON (CLOSED).

6.

Set generator main circuit breaker to ON.

7.

Select AUTO on generator panel. The system is
now ready for automatic operation.

8.

Set transfer switch utility service disconnect circuit
breaker to OFF (OPEN).

With the generator ready for automatic operation, the
engine will crank and start when the utility source power
is turned OFF after a five second delay (factory default
setting). After starting, the transfer switch will connect
load circuits to the standby side after a five second warm-
up delay. Allow system to operate through its entire
automatic sequence of operation.

NOTE: 

Timer durations may differ between generators

and settings.

With the generator running and loads powered by
generator AC output, set the transfer switch utility service
disconnect circuit breaker to ON (CLOSED). The
following will occur:

The switch will transfer loads back to the utility power
source after approximately 15 seconds.

The generator will shut down approximately one
minute after transfer.

With the generator in the AUTOMATIC mode, the system
is now set for fully automatic operation.

Installation Summary

1.

Verify the installation has been properly performed
as outlined by the manufacturer and that it meets
all applicable laws and codes.

2.

Verify proper operation of the system as outlined in
the appropriate installation and owner’s manuals.

3.

Educate the end user on proper operation, mainte-
nance, and service call procedures.

NOTE: 

The utility power circuit breaker in the transfer

switch must be turned OFF to simulate a utility outage.
Shutting off the main disconnect in a subpanel connected
to the transfer switch will NOT simulate an outage. 

Shutting Generator Down While 

Under Load

IMPORTANT NOTE: To avoid equipment damage,
follow these steps, in order, when shutting the gener-
ator down during utility outages. Shutdowns may be
required during outages to perform routine mainte-
nance or to conserve fuel.

To turn the generator OFF (while running in AUTO
and online):

1.

Turn the main utility disconnect off.

Summary of Contents for RXSW400A3CUL

Page 1: ...AC COM 1 888 GENERAC 888 436 3722 Para espa ol visita http www generac com service support product support lookup Pour le fran ais visiter http www generac com service support product support lookup S...

Page 2: ...ii Automatic Transfer Switch Owner s Manual 000393a WARNING CANCER AND REPRODUCTIVE HARM www P65Warnings ca gov...

Page 3: ...ner Load 11 Auxiliary Contacts 13 Fault Current Label 13 Section 4 Operation Functional Tests and Adjustments 15 Manual Operation 15 Close to Normal Source Side 16 Close to Standby Source Side 16 Retu...

Page 4: ...iv Automatic Transfer Switch Owner s Manual This page intentionally left blank...

Page 5: ...unsafe Throughout this publication and on tags and decals affixed to the unit DANGER WARNING CAUTION and NOTE blocks are used to alert personnel to special instructions about a particular operation th...

Page 6: ...ng and connections to unit Failure to follow proper installation requirements could result in death serious injury and equipment or property damage 000120 CAUTION Equipment damage Verify all conductor...

Page 7: ...000213 DANGER Electrocution Only authorized personnel should access transfer switch interior Transfer switch doors should be kept closed and locked Failure to do so will result in death or serious in...

Page 8: ...Introduction and Safety 4 Automatic Transfer Switch Owner s Manual This page intentionally left blank...

Page 9: ...UL listed transfer switch has locking provisions for the utility entry cabinet In addition it has a lockout tagout provision for the service entrance circuit breaker Transfer Switch Mechanism See Figu...

Page 10: ...s affixed to the equipment The following publications outline the safe use of transfer switches Canadian Electrical Code CE CSA C22 1 NFPA 70E Standard for Electrical Safety In The Workplace UL CUL 10...

Page 11: ...top priorities then use additional SMMs as the remaining priorities A SMM can share a priority with an A C priority on the SACM provided the generator is sized to handle the combined surge load from b...

Page 12: ...General Information 8 Automatic Transfer Switch Owner s Manual This page intentionally left blank...

Page 13: ...to it Mount the switch vertically to a rigid supporting structure To pre vent switch distortion level all mounting points If neces sary use washers behind mounting holes to level the unit Open Enclosu...

Page 14: ...ent to which they will be subjected based on the 75 C column of tables charts etc used to size con ductors The installation must comply fully with all appli cable codes standards and regulations Knock...

Page 15: ...tor within the equipment cable or conduit See NEC 300 3 C 1 Connecting SACM See Figure 3 3 The SACM can control an air conditioner 24 VAC directly Control of Air Conditioner Load 1 Route the thermosta...

Page 16: ...t 2 D Air Conditioner 2 E Thermostat 3 F Air Conditioner 3 G Thermostat 4 H Air Conditioner 4 T1 fused Battery Charge N1 fused Utility Sense N2 fused Utility Sense 0 Ground 194 12 VDC 23 Transfer Cont...

Page 17: ...transfer equipment be field marked on the exterior of the transfer equipment For NEC compliance verify the required short circuit current rating of the transfer switch before installation The com ple...

Page 18: ...Installation 14 Automatic Transfer Switch Owner s Manual This page intentionally left blank...

Page 19: ...Operation See Figure 4 1 A manual handle A is shipped with the transfer switch Manual operation must be checked BEFORE the transfer switch is operated electrically Proceed as follows to check manual o...

Page 20: ...MM manufac turer s literature for additional information Utility Voltage Checks 1 Turn ON the UTILITY power supply to the transfer switch with whatever means provided such as the UTILITY main line cir...

Page 21: ...transfer switch 5 Set transfer switch utility service disconnect circuit breaker to ON CLOSED 6 Set generator main circuit breaker to ON 7 Select AUTO on generator panel The system is now ready for au...

Page 22: ...e test pushbutton will work when the ATS is in the utility or the generator position Figure 4 2 Test Pushbutton and Fuse Removal Installation Tool 1 Turn on the utility supply to the ATS 2 Verify mana...

Page 23: ...nual 19 Section 5 Drawings and Diagrams Installation Drawing No 0K2438 A 400A Service Entrance Rated PP PP PP PP PP PP PP 3 2 86720 5 6833 2 7 21 PP 127 25 5 5 7 1 6 21 8 76 0867 17 5 2 1 5 20321 176...

Page 24: ...rams 20 Automatic Transfer Switch Owner s Manual Interconnection Drawing No 10000041110 Part 1 of 2 Liquid Cooled Generator GROUP G INTERCONNECTION DIAGRAM ID 400A CUL SACM DRAWING 10000041110 REVISIO...

Page 25: ...ings and Diagrams Automatic Transfer Switch Owner s Manual 21 No 10000041110 Part 2 of 2 Air Cooled Generator GROUP G INTERCONNECTION DIAGRAM ID 400A CUL SACM DRAWING 10000041110 REVISION A DATE 07 18...

Page 26: ...s 22 Automatic Transfer Switch Owner s Manual Schematic and Wiring Diagram No 10000041100 Part 1 of 2 Schematic Diagram SCHEMATIC DIAGRAM SERVICE ENTRANCE W SMART AC MODULE DRAWING 10000041100 REVISIO...

Page 27: ...awings and Diagrams Automatic Transfer Switch Owner s Manual 23 No 10000041100 Part 2 of 2 Wiring Diagram WIRING DIAGRAM SERVICE ENTRANCE W SMART AC MODULE DRAWING 10000041100 REVISION A DATE 07 31 20...

Page 28: ...Drawings and Diagrams 24 Automatic Transfer Switch Owner s Manual This page intentionally left blank...

Page 29: ...Drawings and Diagrams Automatic Transfer Switch Owner s Manual 25 This page intentionally left blank...

Page 30: ...Drawings and Diagrams 26 Automatic Transfer Switch Owner s Manual This page intentionally left blank...

Page 31: ......

Page 32: ...ights reserved Specifications are subject to change without notice No reproduction allowed in any form without prior written consent from Generac Power Systems Inc Generac Power Systems Inc S45 W29290...

Reviews: