10
GENERAC
®
G22 KINETIC LOG SPLITTER
5.
Position the right and left side Cradle Extensions and secure to the Tray and
Mounts with eight 3/8-16 X 1" Carriage Bolts and 3/8-16 Flanged Locknuts
by hand but do not tighten (
Figure 6
). Ensure that the two forward inner
Bolts go through the Cradle Extension, Tray and Support Brackets.
Hardware tightening sequence
6.
First, tighten the four Bolts and Locknuts that secure the Cradle Extensions
to the Tray and Support Brackets using a Ratchet and Extension with a 9/16"
Socket (
Figure 7
).
7.
Second, tighten the two Bolts and Locknuts that secure the Tray to the
Support Brackets at the front and the Cradle Extensions to the Mounts at the
rear.
8.
Third, tighten the four Bolts and Locknuts that secure the Cradle Extensions
to the Mounts.
9.
Fourth, tighten the four Bolts and Locknuts that secure the Frame Stand and
Support Brackets to the Beam (
Figure 8
).
10.
Last, tighten the four Bolts and Locknuts that secure the Cradle Extension
Mounts to the Beam (
Figure 9
).
11.
Remove the Jack Stand.
12.
If this is an aftermarket kit your kit install is complete. If this was a kit install
for a new machine setup, return to the Safety and Operating Instructions
manual to continue with the setup of the Log Splitter.
Tighten
Last
Figure 9
Tighten
fourth
Figure 8
Top Hole
Not Used
Tighten
First
Figure 7
Tighten
Second
Tighten
Third
Left Side
Cradle
Extension
Figure 6
Right Side Cradle
Extension
Bolt through
Tray and
Brackets
Bolt through
Tray and
Mounts
Bolt through Tray
Cradle Extension
Summary of Contents for G22
Page 23: ...CONTACT US AT 1 888 545 6576 23 Notes ...
Page 25: ...CONTACT US AT 1 888 545 6576 25 Schematic TRAY FRAME STAND AND GUARD ASSEMBLY ...
Page 27: ...CONTACT US AT 1 888 545 6576 27 Schematic DRIVE ASSEMBLY ...
Page 29: ...CONTACT US AT 1 888 545 6576 29 Schematic FRAME AND AXLE ASSEMBLY ...