background image

 

 

 
Edificio Genebre. Av. de Joan Carles I, 46-48 
08908 L'Hospitalet de Llobregat. Barcelona (Spain) 
[email protected]   - www.genebre.es 

 

 

GENEBRE S.A. 

FECHA DE REVISIÓN: 16/03/2020         NUMERO DE REVISIÓN:  1 

 
 

3. Safety Instructions  

 

The scope of this manual is to enable a competent user to install, operate, adjust and 
inspect a Digital Positioning System to GE quarter turn electric actuator. These 
instructions must be observed, otherwise a safe operation of the actuator is no longer 
warranted.

 

 
 
 
 

 

  

 

 
 
 
 

 

 
 

 
4. Transport and Storage 

 

 

All 

products are packed in sturdy packing. During transport measures should 

be adopted in order to prevent impacts, hits. 

  Storage must be off the floor, covered with a sealed dust protector. 

  While commissioning, Genebre, S.A. recommend a visual inspection in order to 

                detect any anomaly caused during the transport, handling or during the 
                storage.

 

 

 
5. Pre-Installation Inspection 

 

  Verify the product nameplate to insure correct model number, before installation or 

use. 

 

Verify that the Kit is compounded from all parts (see Figure 1).  

  If there is any discrepancy, please contact with our local distributor, or Genebre, 

S.A., to solve that discrepancy. 

 

 

 

As electric device, during electrical operation certain parts inevitably carry 
lethal voltages and currents (ELECTRICAL RISKS). Work on the electrical 
system or equipment must only be carried out by a skilled electrician himself or 
by specially instructed personnel, in accordance with the applicable electrical 
engineering rules, health and safety Directives and any other 

national legislation 

applicable. 

 

Under no circumstances should any modification or alteration be carried out 
on the actuator as this could very well invalidate the conditions which the 
device was designed. 

Summary of Contents for 5810 00

Page 1: ...obregat Barcelona Spain genebre genebre es www genebre es GENEBRE S A FECHA DE REVISI N 16 03 2020 NUMERO DE REVISI N 1 1 INSTALLATION OPERATION MAINTENANCE MANUAL Digital Positioning System to Electr...

Page 2: ...EVISI N 16 03 2020 NUMERO DE REVISI N 1 2 INSTRUCTIONS FOR INSTALLATION OPERATION MAINTENANCE MANUAL 1 Product Description 3 2 Technical Features Data 3 3 Safety Instructions 4 4 Transport and Storage...

Page 3: ...y of the position see characteristics The Digital Positioner in communication with the electronic system of the actuator provides an integral management of the motion on the actuator Sign position inp...

Page 4: ...rder to detect any anomaly caused during the transport handling or during the storage 5 Pre Installation Inspection Verify the product nameplate to insure correct model number before installation or u...

Page 5: ...1 6 Positioner Mounting Reserve the space for maintenance routines and tasks Safety instructions on chapter 3 must be observed Work on electrical system or equipment must only be carried out by skill...

Page 6: ...6 1 Preparing the Cover The cover of the kit is for a GE 0 GE 05 y GE 1 models In case you want to mount a kit on GE 15 follow the instructions Remove the Cap and leave the o ring inside the hole Rem...

Page 7: ...tor into a modulating function with positioner proceed as follows 6 2 Remove the hand wheel Remove the screw which are fixing the hand wheel Fig 2 6 3 Remove the 6 screws which are fixing the body to...

Page 8: ...E S A FECHA DE REVISI N 16 03 2020 NUMERO DE REVISI N 1 8 6 5 Carefully remove the visual position indicator Fig 6 6 6 Fix the plastic column B on the base plate by using 2 sheet metal fixing screws D...

Page 9: ...the DPS positioner PCB C matching the cleft of the shaft with the key inside the DPS gear Fig 10 6 10 Press the DPS positioner along the shaft until PCB connector JP3 is plugged in the actuator PCB co...

Page 10: ...e position indicator matching its inner key with the cleft of the shaft Fig 13 6 14 Put DIP 1 in ON position connect the grey connector to the power supply put DIP 1 back to the prior position Wait un...

Page 11: ...genebre es GENEBRE S A FECHA DE REVISI N 16 03 2020 NUMERO DE REVISI N 1 11 Different configurations 6 17 Carefully mount the cover minding the cables not to be pressed Fig 16 6 18 Fix the cover to t...

Page 12: ...rubber joints and fix them to the cover by using the screws Fig 19 The unit is ready to work 6 21 Outer Set Up only if necessary B plug Connect a cable between PIN 1 and PIN Earth Fig 20 A plug Connec...

Page 13: ...Conector gris VAC 2 WIRES Grey plug PIN 1 Neutro PIN2 Fase Alimentaci n El ctrica Power supply A VCC 2 CABLES Conector gris VDC 2 WIRES Grey plug PIN 1 Negativo PIN 2 Positivo Alimentaci n El ctrica...

Page 14: ...power supply is disconnected prior to removing the top cover by disconnecting the DIN power input plug The LED status light provides visual communication between the actuator and the user 9 Maintenanc...

Reviews:

Related manuals for 5810 00