1
.
Fitting installation: Open the packing first and take out the bathtub,then install all the fittings.
2.
Level test: First,place the ma ssage bathtub at installation point,then check wh ether it is
level by visual test.Second,let proper
water in then drain it out, in order to check
whether
it is at the best state of draining
4. The power plug,the cold-hot water pipe connection and the drainage should be got ready
in advance according to the electrical instruction picture (see following chart).
5. Check whether all the accessory are in order before installation,and be free to contact us
if there is any problem
6. Please prepare the hammer,spanner,screwdriver,multimeter and so on before
installation
7. Be careful as far as possible during the installation process,avoiding the sharp and hard
object fall straight down to hit or scratch the surface to cause unnecessary loss.
SSWW
St e p s o f i n sta l l ati o n
3 . F o o t a d j u s t m e n t :
Adjust the support foot
untill it is horizontal.
5.Drainage installation:
Install the drainage at the
tub bottom first, then
connect it to the drain
outlet.Please make sure
t h e d r a i n p i p e i s n o t
flexed .
4. Cold-hot water pipe
connection: Move the
bathtub slightly toward
outside, then install the
w a t e r p i p l e w i t h
“Cold” or “Hot” mark
at the corresponding
position
.
6.Power connection:
U s e m u l t i m e t e r t o c h e c k
whether the ground wire in
power plug is connect well with
the pump surface and support
rack, then connect the yellow
and green wire with earth
.Finally,insert the plug into
socket
.
SSWW
P r o file
3
SSWW
I nstal l i n g p r e parat i o n a n d a t t e n tion
1
.
be
。
2
.
。
3
.
。
The installation space should
larger than the product size (see following chart).
Please leave proper space in order to install or maintain conveniently
The floor should be level,the wall should be essential vertical , and the wall corner
Should be 90 degree
The floor should be level and firm(eg. Cement,tile floor) so that the bathtub foot can
contact the floor evenly
P age 1
Dear customer:
Thank you for using our massage bathtub.This product series we designed is characterized
by its superior material,neat style,comfortable,practical and economical.It is the new
generation of leisure product,and it will bring you great relaxation and pleasure bath
.
Please check whether the spare parts in order according to the overall chart after opening
the packing,and analyze the product structure and installation position of accessory,then
start the installation according to the following instruction
.
You are welcome to visit our website www.gemy.cn if there is any question
.
15
25
1
52
5
72
0
1
1
90
70
0
72
0
6
5
0
2155
900
0
70
40
0
&
0
5
4
0
0
11
0
9
Power
o wa
e
H
t
t r
l
er
Coo
wat
&
50
7. Installation completion: Push the bathtub to installation position after checking
everything is ok,then place the silicon glue along the gap between the wall and bathtub
edge. The installation procedure is complete here
.
SSWW
A d j ustme n t .
1.
First,turn on the cold water valve after the silicon glue is dry,then adjust the hot water
valve until the mixed water with proper temperature. Second,twist the water separatering
valve to the shower function,then adjust the portable shower ,to let the water in and clean
the bathtub
.
r
e
D ain r
http
://
www
.
gemy
.
cn
Page 2
http
://
www
.
gemy
.
cn