Rev. 03 05/20
44
Operation
OptiStar 4.0 (CG21)
Setting the electrode rinsing air
1.
Press the
key.
The second display level will be shown.
2.
Adjust the correct electrode rinsing air according to the applied
nozzles (deflector plate, flat jet nozzle)
≈ 0.1 Nm³/h
≈ 0.5 Nm³/h
too much electrode rinsing air
3.
If in this display level is no operation for 3 seconds, the first display
level is switched over independently.
Setting the fluidization
The powder fluidization depends on the powder type, the air humidity and
the ambient temperature. Fluidizing and vibration start by switching on the
control unit.
Procedure:
1.
Configure AirMover by opening the ball valve complete and adjusting
with the flow control valve (equipment type F only)
2.
Open the powder container cover (equipment type F only)
3.
Press the
key
The second display level will be shown
4.
Adjust the fluidizing air with the keys
T5/T6
– If in this display level is no operation for 3 seconds, the device
switches back to the first display level
– The powder should only be touched gently, but should be
"cooked" regularly and is also to be stirred using a rod
5.
Close again the cover
Summary of Contents for GG21
Page 6: ......
Page 40: ...Rev 03 05 20 40 Start up OptiStar 4 0 CG21 ...
Page 52: ...Rev 03 05 20 52 Operation OptiStar 4 0 CG21 ...
Page 56: ...Rev 03 05 20 56 Maintenance Repairs OptiStar 4 0 CG21 ...
Page 60: ...Rev 03 05 20 60 Fault clearance OptiStar 4 0 CG21 ...
Page 62: ...Rev 03 05 20 62 Disposal OptiStar 4 0 CG21 ...
Page 67: ...Rev 03 05 20 OptiStar 4 0 CG21 Spare parts list 67 Inside back plate fig 26 OptiStar CG21 ...
Page 69: ...Rev 03 05 20 OptiStar 4 0 CG21 Spare parts list 69 Connecting material fig 27 ...
Page 70: ......
Page 72: ...Rev 03 05 20 72 Index OptiStar 4 0 CG21 ...
Page 73: ......
Page 74: ...Rev 03 ...