STEP 1
Mount the adjustable rails using customer
provided cage nuts and screws. The new build
rails will be used to support the network switch,
SwitchAir chassis and insert. Attach the new rails
using only the top front screw holes on both rack
front rails. The rail extension tab attaches to the
rack rear using a single cage nut and screw. Use the
center hold of the 1U space for this attachment.
STEP 3
SwitchAir is not in the fully extended
position when shipped from the factory. Pull
evenly on the chassis mounting tabs for the
desired depth.
STEP 2
Slide the network switch into the rails and
mount to the rack using customer provided cage
nuts and screws.
STEP 4
Insert SA1 into the rails and push unit until
the insert comes into contact with the network
switch and the chassis tabs are in contact with
the rack. During this process route the cables
through the brush openings. Install the bottom
SA1 chassis screws on both sides.
Install is complete.
1
2
3
4
Rack Rear
Install Adjustable Rails For SA1
and Data Switch Mounting
Install Top Cage Nuts
and Screws to Both
Sides of Rack Front
Mount to
Center Hole
of 1U Space
Route Cables
Network Switch
Insert
Slide SA1 into Rails
Pull Evenly on Tabs to Extend
Attach to Rack
Geist Americas
Geist Europe
Geist Asia
Geist DCiM
China
Hong Kong
800.432.3219
1.877.449.4150
+44 (0) 1823 275100
+86.755.86639505
+852 90361927
geistglobal.com
geistglobal.com
geistglobal.com
geistglobal.com
geistglobal.com
GM1177