background image

STEP 1

 Mount the adjustable rails using customer 

provided cage nuts and screws. The new build 
rails will be used to support the network switch, 
SwitchAir chassis and insert. Attach the new rails 
using only the top front screw holes on both rack 
front rails. The rail extension tab attaches to the 
rack rear using a single cage nut and screw. Use the 
center hold of the 1U space for this attachment.

STEP 3

 

SwitchAir is not in the fully extended 

position when shipped from the factory. Pull 
evenly on the chassis mounting tabs for the 
desired depth.

STEP 2

 Slide the network switch into the rails and 

mount to the rack using customer provided cage 
nuts and screws. 

STEP 4

 Insert SA1 into the rails and push unit until 

the insert comes into contact with the network 
switch and the chassis tabs are in contact with 
the rack. During this process route the cables 
through the brush openings. Install the bottom 
SA1 chassis screws on both sides. 

Install is complete.

1

2

3

4

Rack Rear

Install Adjustable Rails For SA1 
and Data Switch Mounting 

Install Top Cage Nuts 
and Screws to Both 
Sides of Rack Front

Mount to 
Center Hole 
of 1U Space

Route Cables

Network Switch

Insert

Slide SA1 into Rails

Pull Evenly on Tabs to Extend

Attach to Rack

Geist Americas  

 

Geist Europe  

Geist Asia

    

Geist DCiM 

 

China 

Hong Kong 

800.432.3219 

1.877.449.4150 

+44 (0) 1823 275100 

+86.755.86639505 

+852 90361927

geistglobal.com  

geistglobal.com 

geistglobal.com 

geistglobal.com 

geistglobal.com

GM1177

Reviews: