18
81086_G-Vision 67_12-2021_ENG
- The equipment shall only be used in an area of not more than
pollution degree 2, as defined in IEC/EN 60664-1.
- The equipment shall be installed in an enclosure that provides
a degree of protection not less than IP 54 in accordance with
IEC/EN 60079-15.
- Transient protection shall be provided that is set at a level
not exceeding 140 % of the peak rated voltage value at the
supply terminals to the equipment.
- Install the HMI device according to the accompanying
installation instructions.
- Ground the HMI device according to the accompanying
installation instructions.
- Only qualified personnel may install the HMI device or
repair it.
- Care shall be taken not to allow layers of dust to form on the
graphic panel in a way that might cause the accumulation of
static charges. Keep the faceplate of the HMI device clean:
the equipment must be cleaned only with a soft cloth and
neutral soap product. Do not use solvents.
- This device should not be used for purposes and methods
other than indicated in this document and
in the
documentation accompanying the product.
G-Vision devices products delivery configuration is based on a
loader. Use the services of the loader to install applications on
the device such as GF Designer HD or GF Project VX runtime.
GF Designer HD or GF Project VX are required, they are
Gefran IDE software tools that must be properly installed on
a computer running Microsoft Windows.
If you are planning to use your G-Vision with Gf Project VX
you must first initialize it using the
“System Settings menu”
(see next chapter).
In “Application” menu select “App Management” and then
“install/update”.
At this point you need the files
“ata0a.zip” and “ata0a.zip.
md5sum” contained in the GF project VX installation folder
(C:\Gefran Automation Builder\GF_ProjectVX-4.x.x-64bit\
diskimages\install_zip\G-Vision\).
If you are accessing to system settings through a browser in
your PC simply point at the files in the indicated folder.
If you are operating directly on the panel touch screen insert
a USB key were you previously copied the files.
After proceeding with the installation procedure the panel
needs to reboot and will be ready to download the application
directly from GF Project VX.
If you are planning to use your G-Vision with GF Designer HD
there are two options to transfer a GF Designer HD runtime
and application project to the device:
Ethernet
Connect the HMI device to the computer with
an Ethernet network. In GF Designer HD select
the command Run/Download to target. You may
have to ensure that the proper firewall policy has
been configured in the computer to allow GF
Designer HD to access the network.
USB
Create an Update Package using GF Designer
HD and copy it to a USB Flash drive. Insert
the USB key in the G-Vision and proceed in
“Application” menu as indicated for GF Project
VX.
9. GETTING STARTED
8. SPECIAL INSTRUCTION FOR USE