![Gefen EXT-WHD-1080P-LR User Manual Download Page 24](http://html1.mh-extra.com/html/gefen/ext-whd-1080p-lr/ext-whd-1080p-lr_user-manual_2205072024.webp)
page | 14
Once the power supplies are connected, the Sender and Receiver unit(s) will begin the
linking process. During this time, the LED indicator on the
Info
buttons and Input LED
Indicators will flash blue for approximately 10 - 15 seconds. After this time, the source will
be shown on the display that is connected to the Receiver unit.
Figure 2.1 -
Info and Input LED indicators flash blue during the linking process.
By default, HDMI 1 is selected. Therefore, the Input LED indicator for HDMI 1 will flash
along with the
Info
LED indicator. If HDMI 2 is selected, then the LED indicator will flash
along with the Info LED indicator. See
Switching Sources (page 16)
for more information
on switching sources.
B
asic Oper
ation
B
asic Oper
ation
The Linking Process
®
Input
Info
1
2
Wireless for HDMI 5 GHz R
HDMI
IR IN
®
Wireless for HDMI 5 GHz S
w/ Dual Inputs and Local Output
Input
1
2
Info
DC 5V
IR OUT
SERVICE
HDMI 1
HDMI 2
HDMI OUT
Input
1
2
Info
®
Wireless for HDMI 5 GHz S
w/ Dual Inputs and Local Output
Input
1
2
Info
DC 5V
IR OUT
SERVICE
HDMI 1
HDMI 2
HDMI OUT
Input
1
2
Info
®
Input
Info
1
2
Wireless for HDMI 5 GHz R
HDMI
IR IN
Flashing
Input
LED
Flashing
Info
LED
B
asic Oper
ation
B
asic Oper
ation
Summary of Contents for EXT-WHD-1080P-LR
Page 9: ...ix This page left intentionally blank...
Page 10: ...This page left intentionally blank...
Page 11: ...Wireless for HDMI 5 GHz w Dual Inputs and Local Output 1 Getting Started...
Page 21: ...This page left intentionally blank...
Page 22: ...This page left intentionally blank...
Page 23: ...Wireless for HDMI 5 GHz w Dual Inputs and Local Output 2 Basic Operation...
Page 44: ...This page left intentionally blank...
Page 45: ...Wireless for HDMI 5 GHz w Dual Inputs and Local Output 3 Appendix...