7.
Slowly fill the engine coolant into the Coolant Recovery
Reservoir to the standard scale, so that the air will be
discharged from the cooling outlet pipe.
8.
Start the engine until the thermostat switches on. When
the radiator inlet and outlet pipes are hot, it can be
identified that the thermostat is switched on.
9.
Shut down the engine. Confirm that the engine coolant
drainage valve is not leaking. (Repeat the above steps
until the discharged coolant is free of bubble.)
10. Fill the engine coolant so that the engine coolant Coolant
Recovery Reservoir coolant level reaches the highest
scale (MAX location).
2.8.8.2
Coolant
Recovery
Reservoir
Replacement
Removal Procedure:
Warning!
Refer to "Warnings and Notices" in the "warning on
cooling system maintenance."
FE02-0321b
1.
Discharge the engine coolant.
2.
Remove the coolant recovery reservoir upper retaining
bolt.
Engine
Cooling System JL4G18-D
2-483
EC718/EC718RV EC715/EC715RV 10/2009
Summary of Contents for EC715 2009
Page 4: ......
Page 330: ...Next Step 10 End 2 248 Fuel System JL4G18 D Engine EC718 EC718RV EC715 EC715RV 10 2009 ...
Page 1164: ......
Page 2008: ......