FE07-0024b
3.
Install the tie rod and the ball joint to the steering knuckle.
4.
Install the tie rod and the slotted hex nut and tighten.
Torque: 33 Nm (Metric) 24.3 lb-ft (US English)
5.
Install the tie rod ball nut locking pin.
6.
Install the tires.
7.
Carry out the front toe adjustment. Refer to
8.
Tighten the steering bar and the ball joint adjust nut.
Torque: 78 Nm (Metric) 57.5 lb-ft (US English)
7.2.8.12 Power Steering Dust Cover
Replacement
Removal Procedure:
FE07-0027b
1.
Remove the wheels. Refer to
2.
Remove the power steering steering tie rod and the ball
joint. Refer to
3.
Remove the tie rod adjustment nut.
4.
Remove the Power Steering dust cover external retaining
clamp.
FE07-0028b
5.
Remove the power steering dust cover internal retaining
clamp.
6.
Remove the power steering dust cover.
7-32
Hydraulic Power Steering System
Steering System
EC718/EC718RV EC715/EC715RV 10/2009
Summary of Contents for EC715 2009
Page 4: ......
Page 330: ...Next Step 10 End 2 248 Fuel System JL4G18 D Engine EC718 EC718RV EC715 EC715RV 10 2009 ...
Page 1164: ......
Page 2008: ......