Swivel Arm Hoist 

GEDA STAR 200 STANDARD / GEDA STAR 250 COMFORT

 

 

ATTENTION 

Refrain from overheating (overloading) repeatedly and/or operation with low voltage. - Doing 
so shortens the life of the motor. 
 

Faults with the rope winding 

  Rope only winds on the one side on the drum. 

Is the scaffold support, on which the swivel arm hoist is hanging, vertical? 

Is the appropriate rope length for the construction height on the drum? 

Does the rope run vertically out of the drum? 

Wind slack rope onto the cable drum while guided by hand until the load hook hangs free. 

  Rope is wound on the cable drum in opposite winding direction. 

Winding direction of the rope does not match the direction button (UP or DOWN button). 

Swivel arm hoist does not pull the nominal load? 

Rope touches the drum protector? 

 

14  Maintenance 

 

Maintenance work may only be carried out by qualified personnel. 
Make sure that lubricants and spare parts are disposed of in an 
environmentally friendly way. 

 

  Before cleaning and maintenance work, first convey the load suspension device down 

and remove mains plug! 

 

14.1  Check before each use 

  Check electrical cable for damage. 

  Check rope for damage and wear. 

  Function of the EMERGENCY STOP button 

 

If the EMERGENCY STOP button has been pushed, then no upwards or downwards 
movement by the load suspension device should be possible! 

  Carry out a test run with an empty load suspension device and check if 

The entire travel path of the load platform is free. 

Are the upper/lower limit switches functioning? 

 

14.2  Weekly inspection/maintenance 

  Clean dirt off swivel arm hoist. 

  Keep work area around swivel arm hoist clear and clean. 

  Check rope for wear (e.g. breakages in the cable braid, squashed points) and corrosion; if 

necessary replace the rope (Chapter 14.5). 

  Check fastening devices are secure, tighten if necessary. 

 

14.3  Quarterly inspection/maintenance 

Are the notices present and easily legible? 
 

Assembly and Operating Manual 

Page 28 of 38 

BL107 GB Edition 01.2010 

Summary of Contents for STAR 200 STANDARD

Page 1: ...pacity 200 kg 250 kg Year of construction Serial number Mertinger Stra e 60 D 86663 Asbach B umenheim Germany Phone 49 0 9 06 98 09 0 Fax 49 0 9 06 98 09 50 Email info geda de WWW http www geda de BL1...

Page 2: ...LEMENTS 13 6 1 1 GEDA STAR 200 STANDARD 200 kg lifting capacity 13 6 1 2 GEDA STAR 250 COMFORT 250kg lifting capacity 13 6 1 3 Manual control 14 7 TRANSPORT 14 8 REQUIREMENTS FOR THE SITE OF INSTALLAT...

Page 3: ...WARRANTY 31 COPY OF THE EC DECLARATION OF CONFORMITY 32 18 APPENDIX FOR ENTERING REOCCURRING INSPECTIONS 33 LIST OF ILLUSTRATIONS Fig 1 Type plates 5 Fig 2 EMERGENCY STOP button 8 Fig 3 GEDA STAR 200...

Page 4: ...ommunicates important information that is a prerequisite for working safely and economically with the machine The assumption is made that the machine is equipped with all possible options What you sho...

Page 5: ...COMFORT GEDA STAR 200 STANDARD GEDA STAR 250 COMFORT Fig 1 Type plates Manufacturer address Mertinger Stra e 60 D 86663 Asbach B umenheim Phone 49 0 9 06 98 09 0 Fax 49 0 9 06 98 09 50 Email info geda...

Page 6: ...e assets Requirements of assembly personnel The machine may only be assembled operated and maintained by expert persons qualified personnel who can guarantee to handle it appropriately based on their...

Page 7: ...reason good personal safety practice is required to protect personnel and the swivel arm hoist Risks can arise from this swivel arm hoist if it is used incorrectly by untrained personnel or for non i...

Page 8: ...ty or operating behaviour shut down the swivel arm hoist immediately and report the malfunction to the company management or their authorized representative Do not carry out any changes mount parts on...

Page 9: ...rk at the place of utilisation acquaint yourself with the working environment e g obstacles in the work and traffic area ground load bearing capacity and necessary safeguarding of the construction sit...

Page 10: ...s occurring during their work and the measures for averting said risks These requirements can be fulfilled with the aid of operating manuals This operating manual is to supplement national guidelines...

Page 11: ...hoist L x W x H 63 x 63 x 45 Noise emission values The measuring uncertainty constant is 4 dB A LPA 85 dB A Lifting capacity 250 kg Actuator output 1 1 kW 230 V 50 Hz Nominal current 7A Speed 2800 I...

Page 12: ...x 32 x 50 cm with wooden palette 21 kg Hoisting cage 92 x 57 x 44 cm with wooden palette 38 kg Chain suspension for wheel barrows 4 0 kg Slab grab 24 kg Accessories can be used for GEDA STAR 200 STAN...

Page 13: ...h box 5 mains cable 6 safety catch 7 load hook 8 swivelling frame 1 2 3 5 6 7 8 4 Fig 3 GEDA STAR 200 STANDARD 6 1 2 GEDA STAR 250 COMFORT 250kg lifting capacity 1 GEDA STAR 250 COMFORT 2 cable drum 3...

Page 14: ...he building or scaffold by a fastening device Ground floor or scaffold must have sufficient fastening options and bearing capacity 8 1 Electrical connection on site A building site main cabinet with r...

Page 15: ...damage do not start the swivel arm hoist Immediately replace damaged parts Acquaint yourself with the working environment at the place of utilisation e g obstacles in the work and traffic area and nec...

Page 16: ...options All fastening devices fit the GEDA STAR 200 Standard and GEDA STAR 250 COMFORT The swivel arm hoist is suspended in both bearing journals and must be secured by a linchpin 1 NOTE On the GEDA...

Page 17: ...can be turned axially by 180 depending on which direction the swivel arm is to be swung inwards Screw down standpipe 2 at bottom and struts 3 at both ends SW 24 3 Assembly and Operating Manual Page 17...

Page 18: ...anyard rail whereby the pipes are each screwed to two vertical frames with rigid scaffold couplings 6 or assemble the Simple lanyard rail Chp 9 2 Anchor 4 pull and pressure resistant anchor at least 1...

Page 19: ...pport ATTENTION When used on balconies etc they must not be overloaded by the restraints Spread storey support 1 with large head plate 2 above by unwinding the lower spindle 3 between floor and ground...

Page 20: ...be used together with the swivel arm hoists GEDA STAR 200 STANDARD and GEDA STAR 250 COMFORT 10 1 Bucket support for 2 buckets For 2 round or oval buckets or 1 large oval bucket Lifting capacity 75 k...

Page 21: ...n cm Fig 16 Bucket hoist for 4 buckets 10 4 35 litre tilting bucket To tip out open safety device 1 and tilt bucket Lifting capacity 75 kg Weight 9 5 kg all dimensions in cm 1 Fig 17 35 litre tilting...

Page 22: ...1 Fig 19 65 litre mortar silo 10 7 Chain suspension for wheel barrows Lifting capacity 150 kg Weight 4 0 kg all dimensions in cm Safety measures Shorten the chain on the wheel suspension so that the...

Page 23: ...nts cm Outside measurements cm l 62 Ltot 70 w 32 Wtot 44 Lifting capacity 150 kg Weight 21 kg h 50 Htot 67 10 9 Hoisting cage with wooden palette Loading Stack the load on the palette 1 Lift the safet...

Page 24: ...b can be adjusted in height depending on the width of the slab To do this remove the screws 3 always fasten the upper part to the lower part using 4 screws Lowest position for slab widths from 100 to...

Page 25: ...arm hoist immediately Secure the swivel arm hoist thoroughly against unauthorized access Do not leave the manual control lying around at the end of work breaks Never leave the swivel arm hoist loaded...

Page 26: ...GENCY STOP button 1 on manual control Load up Press UP button 2 Load down Press DOWN button 3 Switch off or stop Release UP button 2 or DOWN button 3 In an emergency by operating the EMERGENCY STOP bu...

Page 27: ...ause Remedy Faults may only be remedied by qualified personnel The load must be secured and or detached prior to any troubleshooting ATTENTION Remove mains plug before working on the electrical equipm...

Page 28: ...ubricants and spare parts are disposed of in an environmentally friendly way Before cleaning and maintenance work first convey the load suspension device down and remove mains plug 14 1 Check before e...

Page 29: ...er Wind the rope up again cleanly and evenly 14 5 2 Changing the rope on rope weight Remove one screw 4 on the non twisting device 1 and fold it to the side Push back the rope wedge 2 unscrew the clam...

Page 30: ...al No Operating voltage Desired piece number The type plate is located on the base unit of the machine NOTE Spare parts must correspond to the technical requirements of the manufacturer Only use origi...

Page 31: ...plastic parts Take electrical components to hazardous waste recycling Recommendation Get in touch with the manufacturer or authorise a specialist company with the prescribed disposal 17 Warranty Plea...

Page 32: ...Swivel Arm Hoist GEDA STAR 200 STANDARD GEDA STAR 250 COMFORT Copy of the EC Declaration of conformity Assembly and Operating Manual Page 32 of 38 BL107 GB Edition 01 2010...

Page 33: ...Operating Manual Page 33 of 38 BL107 GB Edition 01 2010 18 Appendix for entering reoccurring inspections Inspection findings _______________________________ Date and signature of the tester Inspection...

Page 34: ...250 COMFORT Assembly and Operating Manual Page 34 of 38 BL107 GB Edition 01 2010 Inspection findings _______________________________ Date and signature of the tester Inspection findings ______________...

Page 35: ...250 COMFORT Assembly and Operating Manual Page 35 of 38 BL107 GB Edition 01 2010 Inspection findings _______________________________ Date and signature of the tester Inspection findings ______________...

Page 36: ...250 COMFORT Assembly and Operating Manual Page 36 of 38 BL107 GB Edition 01 2010 Inspection findings _______________________________ Date and signature of the tester Inspection findings ______________...

Page 37: ...250 COMFORT Assembly and Operating Manual Page 37 of 38 BL107 GB Edition 01 2010 Inspection findings _______________________________ Date and signature of the tester Inspection findings ______________...

Page 38: ...250 COMFORT Assembly and Operating Manual Page 38 of 38 BL107 GB Edition 01 2010 Inspection findings _______________________________ Date and signature of the tester Inspection findings ______________...

Reviews: