GEDA
®
MINI 60 S / MAXI 120 S / MAXI 150 S
Assembly
BL068 GB Edition 03/2015
55 / 90
Assembly and Operating Manual
5.3.4
Assembling the wire rope
Tension the wire rope (10) verti-
cally upwards and, simultaneous-
ly, press the
DOWN
button on
the manual control.
In this position, the flexible drum
guard (11) deactivates the slack
rope switch.
Unwind sufficient rope from the rope drum for the assembly height.
Route the wire rope (10) to the
pivot arm (3) and thread over the
slots of the rope pulleys.
Place the wire rope (10) in the
grooves of both rope pulleys (3c).
Release the pivot arm locking device, swivel the pivot arm (3) out-
wards and tighten the star handle (3a).
Check
Suspend and lift the load (observe the load capacity). In the event of
exceeding the load capacity and moving the rope weight against the
pivot arm, the winch lifts itself and switches off the
UP
movement.
10
11
10
3c
3c
10
3
3
3a