USER INSTRUCTIONS GH11RA
STRONA
15
Wydanie I
STYCZEŃ 2010
7.3.
DHW Priority
The GH11RA Controller allows to set operation of the DHW pump with priority. If you choose this
mode of DHW pump operation, the domestic hot water heating is a higher priority function in the
Controller.
To do this, set the
F00
service setting to the value of “
3
”.
7.4.
Summer Mode
The GH11RA Controller is equipped with a SUMMER MODE option that allows you to turn off the SH
pump for the summer season, and the boiler operates only to supply the DHW water. To do this, set the
F00
service setting to the value of “
4
”.
8.
ROOM PANEL
The GH13RA controller has been fitted for full communication with the GA01HA room panel manufactured
by GECO, which allows to control boiler operation comfortably from user’s apartment.
The GA01HA room panel connected to the GH13RA controller allows:
•
to change boiler preset temperature
•
to change HUW preset temperature
•
information on all alarms to be displayed in room panel
•
to view boiler operation state
•
to view operation states of other units (fan, fuel feeder, central heating pump, HUW pump)
•
to view all measured temperature values
If the GA01HA room panel is correctly connected to the GH13RA controller, it will be automatically
detected by the controller. Then, user is not required to carry out any additional operations or make any
settings.
In this case, the controller will work according to the room panel settings.
Proceed as follows to connect the GA01HA room panel to the GH13RA controller:
Step 1
Step 2
Step 3
Step 4
Step 5
Switch off the
controller using
push-button
and remove
mains cable
plug from
socket
→
Open the
controller
(remove
upper cover
of the
housing)
→
Connect room
panel to the
controller
using
terminals
A-B-C-D (as in
Błąd!
Nieprawidło
wy odsyłacz
do zakładki:
wskazuje na
nią samą.
)
→
Snap shut
upper cover
of the
controller
housing (close
the
controller)
→
Plug in mains cable
in the 230V socket
and switch on the
controller using
push-button