Gebesa ELITE Assembly Manual Download Page 5

STEPS

5

ASCEND | 

“L” SHAPE

3.

PRIME 

DESK

Using the wedges (I), (P), (U) and (O), assemble the panels 

G-CONNECT

CREDENZA

Put the tiles on the panel structure. Using the angle as is shown, 
once the tile is colocated on the panel structure, throw it down. 

4.

ELITE

PANELS

Reviews: