
Maintenance
Adjust the tension of the rope / cable
2005-9015-009
01. August 2018
11.5
Adjust the tension of the rope / cable
Specific maintenance schedule
Every hour during the first day of use
Every day during the first week of use
Every week during the first month of use
Every month during the first six months of use
Warning!
Inadvertent start!
Shutdown is required! Shut the main power supply and lock with a
locking device. Post a sign on the panel stating: ”Do not turn on,
electric work in progress” in order to prevent an inadvertent energizing
of the main electric supply.
Attention!
Improper cable tension affects the load detection system. It causes the
system to malfunction.
● Park the scrapers at the end of
stroke and shut the system down.
● Perform all the following steps using
the furthest scraper (1) from the
drive unit (2).
1
2
3
● Measure the distance between the
draw bar (1) and the stroke limiter
(3).
● Note the measurement.
● Remove the stroke limiter (3) from
the cable.
3
1
Summary of Contents for Fit R-300
Page 38: ...Geometric data 16 scraper 2005 9015 009 01 August 2018 38 168 5 8 16 scraper Floor mounted ...
Page 40: ...Geometric data 16 scraper 2005 9015 009 01 August 2018 40 168 Guided by a groove ...
Page 44: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 44 168 Guided by a groove ...
Page 46: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 46 168 Bidirectional scraper ...