
Maintenance of the ATEX cleaner is mandatory after a maximum of 150
operating hours. Depending on the operating conditions, the operator must
specify shorter maintenance intervals.
The performed maintenance must be logged.
Only original GEA Tuchenhagen maintenance and wear kits intended for ATEX
may be used.
If the maintenance instructions are not followed, the cleaner loses its ATEX
conformity and must not be used in explosive areas.
Preventing further ignition sources
430BAL013060EN_4
20
08.09.2020