Section 2-3 - Facility Needs
P R E L I M I N A R Y
Section 2-3
Facility Needs
2-3-1
Purchaser Responsibilities
The work and materials required to prepare the site are the responsibility of the purchaser. To avoid
delay, complete all pre-setup work before delivery. Use the Pre-setup Check List (provided in
to verify that all the required steps have been completed.
Purchaser responsibilities include:
•
Procuring the required materials.
•
Completing the preparations prior to delivery of the ultrasound system.
•
Paying the costs of any alterations and modifications not specifically provided for in the sales
contract.
Note:
All relevant preliminary electrical installations at the prepared site must be performed by
licensed electrical contractors. Other connections between electrical equipment, and
calibration and testing, must also be performed by qualified personnel. The products involved
(and the accompanying electrical installations) are highly sophisticated and special engineering
competence is required. All electrical work on these products must comply with the
requirements of applicable electrical codes. The purchaser of GE equipment must utilize only
qualified personnel to perform electrical servicing of the equipment.
To avoid delays during setup, the individual or team who will perform the setup should be notified at the
earliest possible date (preferably prior to setup), of the existence of any of the following variances:
•
Use of any non-listed product(s).
•
Use of any customer provided product(s).
•
Placement of an approved product further from the system than the interface kit allows.
The prepared site must be clean prior to delivery of the system. Carpeting is not recommended because
it collects dust and creates static. Potential sources of EMI should also be investigated before delivery.
Dirt, static, and EMI can negatively impact system reliability.
Summary of Contents for Vivid S60N
Page 4: ...DIRECTION FR091521 REVISION 3 VIVID S60N VIVID S70N BASIC SERVICE MANUAL ii ...
Page 5: ...DIRECTION FR091521 REVISION 3 VIVID S60N VIVID S70N BASIC SERVICE MANUAL iii ...
Page 6: ...DIRECTION FR091521 REVISION 3 VIVID S60N VIVID S70N BASIC SERVICE MANUAL iv ...
Page 7: ...DIRECTION FR091521 REVISION 3 VIVID S60N VIVID S70N BASIC SERVICE MANUAL v ...
Page 8: ...DIRECTION FR091521 REVISION 3 VIVID S60N VIVID S70N BASIC SERVICE MANUAL vi ...
Page 9: ...DIRECTION FR091521 REVISION 3 VIVID S60N VIVID S70N BASIC SERVICE MANUAL vii ...
Page 10: ...DIRECTION FR091521 REVISION 3 VIVID S60N VIVID S70N BASIC SERVICE MANUAL viii ...
Page 11: ...DIRECTION FR091521 REVISION 3 VIVID S60N VIVID S70N BASIC SERVICE MANUAL ix ...
Page 12: ...DIRECTION FR091521 REVISION 3 VIVID S60N VIVID S70N BASIC SERVICE MANUAL x ...
Page 13: ...DIRECTION FR091521 REVISION 3 VIVID S60N VIVID S70N BASIC SERVICE MANUAL xi ...
Page 14: ...DIRECTION FR091521 REVISION 3 VIVID S60N VIVID S70N BASIC SERVICE MANUAL xii ...
Page 477: ......