Appendix A
Installation Tools and Supplies
The tools and supplies for a product installation are listed below. If GE performs the
installation, the GE installation engineer will provide these items:
GE-supplied Items
A.1
Qty
Description
2
9
/
16
in. Combination wrench (must be imperial
9
/
16
in.)
1
30 cm (12 in.) Adjustable wrench
1
35 – 40 cm (14 in.) Pipe wrench
1
1
/
8
flat blade screwdriver
1
¼ in. flat blade screwdriver
1
#2 Phillips screwdriver
1
¼ in. Tubing bender
1
¼ in. Tubing cutter
1
Non-metallic tape measure
1
Level capable of indicating plumb and level within 5 degrees
1
Permanent marker (fine tip)
1
22 – 14 Gauge wire cutter/stripper
1
Small diagonal cutting pliers
1
Quality vacuum pump with approximately 3 ft of clear ¼ in. tubing fitted with a ¼ in.
compression fitting at the end of the tubing
1 roll
12 mm (½ in.) width PTFE pipe-sealing tape or PTFE pipe compound
25
30 cm (12 in.) Nylon UV-resistant cable ties
1 bag
¼ in. tubing P clamps
1
Laptop computer for commissioning the product and running the TRANSCOM software for
downloading and interpreting the results of the gas analysis. Minimum specification:
Windows® 2000 or Windows® XP operating system, PII 400 MHz processor, 128 MB of RAM
and 1.2 GB hard drive space, 28.8 Kbps modem or faster and USB 1.1 or faster.
A.2
Customer-supplied Items
The following tools and supplies are needed on site to secure the mounting stand (if
used), tighten the 2 in. pipe fittings (if used) and complete the installation. GE is unable to
bring the following items due to size and weight restrictions, so the customer should
provide them.
Qty
Description
1
12 mm (½ in.) capacity hammer drill with 9.5 mm (
3
/
8
in.) masonry bit
1
36 in. pipe wrench if large fittings are used to provide oil to the product
1
Scaffolding, lift or approved platform to obtain access to valves (if needed)
1
Suitable vessel to collect at least 4 litres of waste oil during the commissioning process
1
Absorbent cloths
12
M8 threaded fasteners with a recommended minimum length of 80 mm for the concrete pad