GE Multilin
T60 Transformer Protection System
5-259
5 SETTINGS
5.6 GROUPED ELEMENTS
5
•
Source Transfer Schemes:
In the event of an undervoltage, a transfer signal may be generated to transfer a load
from its normal source to a standby or emergency power source.
The undervoltage elements can be programmed to have a definite time delay characteristic. The definite time curve oper-
ates when the voltage drops below the pickup level for a specified period of time. The time delay is adjustable from 0 to
600.00 seconds in steps of 0.01. The undervoltage elements can also be programmed to have an inverse time delay char-
acteristic.
The undervoltage delay setting defines the family of curves shown below.
(EQ 5.45)
where:
T
= operating time
D
= undervoltage delay setting (
D
= 0.00 operates instantaneously)
V
= secondary voltage applied to the relay
V
pickup
= pickup level
Figure 5–124: INVERSE TIME UNDERVOLTAGE CURVES
At 0% of pickup, the operating time equals the UNDERVOLTAGE DELAY setting.
T
D
1
V
V
pickup
------------------
–
----------------------------------
=
842788A1.CDR
% of voltage pickup
T
ime
(seconds)
NOTE
Summary of Contents for T60
Page 6: ...vi T60 Transformer Protection System GE Multilin TABLE OF CONTENTS ...
Page 14: ...xiv T60 Transformer Protection System GE Multilin TABLE OF CONTENTS ...
Page 34: ...1 20 T60 Transformer Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Page 490: ...5 344 T60 Transformer Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 522: ...6 32 T60 Transformer Protection System GE Multilin 6 5 PRODUCT INFORMATION 6 ACTUAL VALUES 6 ...
Page 536: ...7 14 T60 Transformer Protection System GE Multilin 7 1 COMMANDS 7 COMMANDS AND TARGETS 7 ...
Page 568: ...10 12 T60 Transformer Protection System GE Multilin 10 6 DISPOSAL 10 MAINTENANCE 10 ...
Page 596: ...A 28 T60 Transformer Protection System GE Multilin A 1 PARAMETER LISTS APPENDIX A A ...
Page 716: ...B 120 T60 Transformer Protection System GE Multilin B 4 MEMORY MAPPING APPENDIX B B ...
Page 762: ...E 10 T60 Transformer Protection System GE Multilin E 1 IEC 60870 5 104 PROTOCOL APPENDIX E E ...
Page 774: ...F 12 T60 Transformer Protection System GE Multilin F 2 DNP POINT LISTS APPENDIX F F ...