background image

 
 
 

 

SPS J200703 L005 

 Quick Start Guide 

Document 850052515   r02 2019 April

 

 

GE

 

Critical Power

 

 

SPS –48V Slimline Power Shelf

 

Models: J2007003L005 - alpha suffixes per Slimline Power System Brochure

 

Quick Start Guide 

Document xxxxxxxxxx   R01 2017 August 

8

 

Precautions

 

 

 

Install, service, and operate equipment only by professional, skilled and qualified personnel who have the 

necessary knowledge and practical experience with electrical equipment and who understand the 

hazards that can arise when working on this type of equipment. 

 

 

Disconnect batteries from outputs and/or follow safety procedures while working on equipment. 

Batteries may be connected in parallel with the output of the rectifiers. Turning off the rectifiers will not 

necessarily remove power from the bus. 

 

 

Do not disconnect permanent bonding connections unless all power inputs are disconnected.

 

 

Verify that equipment is properly safety earth grounded before connecting power. High leakage currents 

may be possible.

 

 

Exercise care and follow all safety warnings and practices when servicing this equipment. Hazardous 

energy and voltages are present in the unit and on the interface cables that can shock or cause serious 

injury. When equipped with ringer modules, hazardous voltages will be present on the ringer output 

connectors.

 

 

Use the following precautions in addition to proper job training and safety procedures:

 

 

Use only properly insulated tools.

 

 

Remove all metallic objects (key chains, glasses, rings, watches, or other jewelry).

 

 

Follow Lock Out Tag Out (LOTO) procedures:  customer specified, site specific, or general as 

appropriate.

 

Disconnect all power input before servicing the equipment. Check for multiple power inputs.

 

 

Wear safety glasses. 

 

 

Follow Personal Protective Equipment requirements:  customer specified, site specific, or general as 

appropriate.

 

 

Test circuits before touching.

 

 

Be aware of potential hazards before servicing equipment.

 

 

Identify exposed hazardous electrical potentials on connectors, wiring, etc.

 

 

Avoid contacting circuits when removing or replacing covers;

 

 

Use a personal ESD strap when accessing or removing electronic components.

 

 

Personnel with electronic medical devices need to be aware that proximity to DC power and distribution 

systems, including batteries and cables, typically found in telecommunications utility rooms, can affect 

medical electronic devices, such as pacemakers. Effects decrease with distance. 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for SPS-48V

Page 1: ...ep 1 Mount Shelf 1 Reposition mounting ears as required 3 screws each Reverse ears for 5 setback Torque to 10 in lb 1 2 Nm Phillips screwdriver 2 Attach shelf to the frame using a minimum of four screws two on each side 12 24 provided Torque to 35 in lb 4 Nm 5 16 socket Step 2 Connect Chassis Ground and DC Reference CO Ground Lug Landings 10 double hole on 5 8 inch center lugs not provided Some ap...

Page 2: ...AC Respectez toutes les règles de câblage locales et nationales lors de la connexion à une prise secteur Caution Route AC cables to avoid contact with sharp or rough surfaces that may damage insulation and cause a short circuit Attention Acheminez les câbles C A pour éviter tout contact avec des surfaces vives ou rugueuses qui pourraient endommager l isolant et provoquer un court circuit Step 4 Co...

Page 3: ...nto its position oriented as shown 15A max Step 6 Set Jumpers LAN Port and Relay per Galaxy Pulsar Edge Controller Quick Start Guide Step 7 Install Controller per Galaxy Pulsar Edge Controller Quick Start Guide Step 8 Install Signal and Communications Cables 1 J1 2Alarms and Inputs Connect to office alarms and signals See Information Alarm Connections for Details 2 J5 LAN Connect to Ethernet netwo...

Page 4: ...powered by a single C13 cord A Controller display follow path Menu Configuration Rectifiers Current Limit B Web Pages or EasyView2 select Settings tab Rectifiers Thresholds Current Limit Information Branch Protection Details SHELF MODELS BRANCH PROTECTION North America CE HIGH RANGE ONLY LOW RANGE HIGH RANGE J2007003 L005 15A 15A 15A J2007003 L005A 2 x 15A 2 x 15A 15A J2007003 L005C 20A 15A 15A In...

Page 5: ...9 S Output PMN Output PMN Input Air Conditioner Fail Output R4 FAJ1 10 W Output PMJ Output PMJ Input External Fan Fail Output R4 Rtn1 2 1 Only with 6 relay controller 6R 2 Returns for R1 and R4 are bridged Other returns are isolated Specifications and Application Specifications and ordering information are in the Slimline Power System Brochure available at www gecriticalpower com External Surge Pr...

Page 6: ...d local rules and regulations Insulation rating 90 C minimum 105 C minimum if internal to enclosed equipment cabinets Size AC field wired conductors with 75 C ampacity NEC equal to or greater than their panel board circuit breaker rating AC and DC input disconnect protection Provide accessible devices to remove input power in an emergency Alarm Signals Provide external current limiting protection ...

Page 7: ...ucteurs câblés suivez tout le code national de l électricité NEC et les règles et réglementations locales Indice d isolation 90 c minimum 105 c minimum si interne aux armoires d équipement fermées La taille des conducteurs câblés de champ AC avec une ampacité de 75 c NEC égale ou supérieure à leur indice de disjoncteur de la carte de panneau Déconnexion protection d entrée AC et DC fournissez des ...

Page 8: ...e present in the unit and on the interface cables that can shock or cause serious injury When equipped with ringer modules hazardous voltages will be present on the ringer output connectors Use the following precautions in addition to proper job training and safety procedures Use only properly insulated tools Remove all metallic objects key chains glasses rings watches or other jewelry Follow Lock...

Page 9: ...s graves Lorsqu il est équipé de modules de sonnerie des tensions dangereuses seront présentes sur les connecteurs de sortie de la sonnerie Utilisez les précautions suivantes en plus des procédures appropriées de formation et de sécurité d emploi N utilisez que des outils correctement isolés Enlevez tous les objets métalliques porte clés lunettes bagues montres ou autres bijoux Suivez les procédur...

Page 10: ...Start Guide 10 Document 850052515 r02 2019 April GE Critical Power SPS 48V Slimline Power Shelf Models J2007003L005 alpha suffixes per Slimline Power System Brochure Quick Start Guide Document xxxxxxxxxx R01 2017 August Notes ...

Page 11: ...Start Guide 11 Document 850052515 r02 2019 April GE Critical Power SPS 48V Slimline Power Shelf Models J2007003L005 alpha suffixes per Slimline Power System Brochure Quick Start Guide Document xxxxxxxxxx R01 2017 August Notes ...

Page 12: ...Start Guide 12 Document 850052515 r02 2019 April GE Critical Power SPS 48V Slimline Power Shelf Models J2007003L005 alpha suffixes per Slimline Power System Brochure Quick Start Guide Document xxxxxxxxxx R01 2017 August Notes ...

Reviews: