![GE Sievers Innovox Operation And Maintenance Manual Download Page 178](http://html.mh-extra.com/html/ge/sievers-innovox/sievers-innovox_operation-and-maintenance-manual_122540178.webp)
GE Analytical Instruments ©2016
178 of 270
DLM 68100-09 EN Rev. A
Chapter 8: Maintenance
Recommended Spare Parts
GEAI recommends that you have available spare seals for the high-pressure valves, reagent peristaltic pump
head, pinch tubing, waste tubing, and NDIR pre-filter. To order spare parts in North America, contact GEAI Order
Entry at 303.444.2009 or 800.255.6964. In Europe, Middle East, and Africa (EMEA), contact us at +44 (0) 161 864
6800 and in Asia Pacific, contact us at (8621) 38777735.
Technical support in North America is available at
303.444-2009 or 888.245.2595 or
. Technical support in Europe, Middle East, and
Africa is available at 44 (0) 161 864 6800 or
. Technical support in Asia Pacific is
.
In other parts of the world, contact your local GE
Analytical instruments representative. You can also visit the
Support
tab on our website at
. Installation and training by a qualified service technician can also be provided.
Periodic Maintenance Tasks
Periodic Inspections
To ensure optimum performance of the Analyzer, inspect the following items periodically.
1.
Reagent levels.
Inspect the reagent and dilution water containers to ensure that there is adequate
acid, oxidizer, and dilution water to perform the analyses
11
. Prepare the reagents, if necessary,
according to the directions in the following section.
2.
Check Standard level.
Inspect the Check Standard carboy to ensure that there is adequate solution to
perform the analyses
.
Table 14: Consumables Replacement Schedule
Description
Typical Operating Life
Pinch valve tubing
3 months of operation
Reactor peristaltic pump tubing
3 months of operation
High-pressure valve seals
1 month of operation
1
1.
Application dependent.
Exterior sample pumps tubing (optional equipment)
3 months of operation
NDIR aerosol filter
3 months of operation
Sample/reagent peristaltic pump tubing
3 months of operation
Syringe lubrication
3 months of operation
Carrier Gas CO
2
Scrubber cartridge (optional equipment)
3 months of operation
Norprene Chemical waste tubing
6 months of operation
11.
This inspection is automatically performed by the Analyzer if the Fail Safe accessory is installed and
activated.