GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card PM A101 - Site Status
Page no. 1773
Chapter 11
JC-PM-A-101.fm
Job Card PM A101 - Site Status
Chapter 11
1
CURRENT SITE STATUS
•
Before the PM visit, telephone the client to determine and discuss any current issues.
•
Obtain the current site error lists by local or remote downloading, so that they can be analysed in
advance.
2
SITE LOGBOOK
1. Review the site Logbook to identify recently applied FMI procedures and last Planned Maintenance
Operation Report.
2. Verify the presence of the following log diskettes or log CD-Rs with the site logbook:
-
PM log
-
Acquisition log
-
Review log
3
REVIEW SYSTEM OPERATION WITH CUSTOMER
1. Discuss with customer to find out if there are any specific problems with the system. Make a list of
problems and distinguish between problems that can be solved by:
-
Corrective maintenance
-
Planned maintenance
2. Propose solution(s) with the customer and come to an agreement on what actions are to be taken.