QS–18
UR SWITCH MODULE – QUICKSTART GUIDE
QUICKSTART GUIDE
Z
Select
Save
and after a short delay you should get a confirmation
that the switch has been successfully configured.
Once both the switch and UR’s IP address and Subnet Mask have been configured, power
must be cycled to both the switch and relay.