5
Installation Instructions
Pre-Installation Cutout
and Required Clearances
1
If cabinets are placed less than 30
”
above the
range, see Alternate Construction, section AF,
on page 16.
30
”
ranges conform to U.L. requirements
for 0
”
spacing from vertical walls below
countertops. Allow 1/4
”
minimum clearance
at the back wall above the countertop.
Wall coverings, counters and cabinets around
range must withstand heat (up to 194
°
F)
generated by the range.