13

    

Figure 7 Communication Connectors

7.1 RS232 Interface

When using the RS232 interface, a cable must be connected directly from the instrument 

to a suitable port on the computer in a ‘point to point’ link. 
The pin connections for the 9-pin D-type, RS232 connector and the relationship between 
the instrument and the RS232 control signals, together with device interconnection 
interface is shown in Table 2-1. The instrument is configured as Data Circuit Terminating 
Equipment (DCE).

1

Power supply adaptor

2

RS232

4

IEEE488

5

 USB B

6

USB A

7

Ethernet (option)

Summary of Contents for PACE 1000

Page 1: ...K0467 Issue No 4 1 GE Measurement Control Pressure Automated Calibration Equipment Safety Instructions and User Guide K0467 PACE Pressure Indicators ...

Page 2: ...ating 3 Pressure port 4 Pressure port 5 Maximum working pressure 6 Pressure full scale range 7 Power supply adaptor see packaging list 1 5 6 2 3 4 A B C 7 22V to 26V 22V to 26V 22V to 26V 22V to 26V XXXX XXXX XX ANALOGUE 1 CONSULT HANDBOOK CONSULT HANDBOOK 22V to 26V 22V to 26V ANALOGUE 1 CONSULT HANDBOOK D 22V to 26V 22V to 26V ANALOGUE 1 VFC 1 15 CONSULT HANDBOOK ...

Page 3: ...pment 1 3 Toxic Materials There are no known toxic materials used in construction of this equipment 1 4 Maintenance The equipment must be maintained using the procedures in this publication Further manufacturer s procedures should be done by an authorized service agents or the manufacturer s service departments 1 5 Technical advice For technical advice contact the manufacturer A qualified technici...

Page 4: ...EPLACE ALL DAMAGED FITTINGS AND EQUIPMENT DO NOT USE ANY DAMAGED FITTINGS AND EQUIPMENT ISOLATE THE POWER SUPPLY BEFORE MAKING ANY ELECTRICAL CONNECTIONS TO THE REAR PANEL 2 Packaging Check the contents of the PACE1000 packaging with the list that follows Packaging List PACE1000 i PACE1000 Pressure Indicator ii Adaptor power supply GE part number 191 370 iii User guide and safety instructions and ...

Page 5: ...THE PRESSURE LINES PROCEED WITH CARE ONLY USE EQUIPMENT WITH THE CORRECT PRESSURE RATING BEFORE APPLYING PRESSURE EXAMINE ALL FITTINGS AND EQUIPMENT FOR DAMAGE REPLACE ALL DAMAGED FITTINGS AND EQUIPMENT DO NOT USE ANY DAMAGED FITTINGS AND EQUIPMENT 3 2 Pneumatic Pressure Figure 2 1 Refer to the Data sheet for the correct pressure mediums to be used 2 Connect the Unit Under Test UUT to the required...

Page 6: ...ated and vented 2 Connect the Unit Under Test UUT to the output connection port Note For instruments with NPT connections use applicable pressure sealing Figure 3 Pneumatic Connections Connection Input ISO228 1 G 1 8 parallel threads DIN ISO228 1 JIS B0202 Reference ISO228 1 G 1 8 parallel threads DIN ISO228 1 JIS B0202 2 1 1 Connector 2 Bonded seal ...

Page 7: ...ic Connection WARNING PRESSURE RANGES 210 bar 3000 psi ARE ONLY RATED FOR HYDRAULIC USE Cautions Do not exceed the maximum pressures stated in the appropriate Component Manual for the unit under test Reduce pressure at a controlled rate when venting to atmosphere Carefully de pressurize all pipes to atmospheric pressure before disconnecting and connecting to the unit under test 4 3 Connections 1 S...

Page 8: ...8 K0467 Issue No 4 4 5 Adaptors Refer to the Data sheet for the range of adaptors ...

Page 9: ... rate when venting to atmosphere Carefully de pressurize all pipes to atmospheric pressure before disconnecting and connecting to the unit under test Observe absolute cleanliness when using the instrument Severe damage can be caused if equipment connected to this instrument is contaminated Connect only clean equipment to the instrument To avoid any contamination an external filter is recommended 4...

Page 10: ...liquid must be clean refer to specification given in the data sheet 4 Connect the Unit Under Test UUT to the appropriate connection port 5 Fill and bleed the UUT and connecting pipes 5 Mounting kits 5 1 Rack mount option Figure 5 There must be enough space at the rear of the instrument for all the cables and pipes The length of the cables and pipes must allow for the removal and installation of th...

Page 11: ...ng two screws and washers supplied 5 2 Panel mount option Figure 6 There must be enough space at the rear of the instrument for all the cables and pipes The length of the cables and pipes must allow for the removal and fitment of the instrument The cooling air of the instrument must not be obstructed Allow a free flow of air through the equipment rack and around the instrument especially at high a...

Page 12: ... 6 Check that the front panel display shows the power up sequence Ref K0470 User manual section 3 2 Note After the power up sequence the instrument shows the default display on the touch screen The touch screen divides into a number of mimic keys 6 2 Requirements for rack mounted and panel mounted instruments 1 Install an accessible power isolator to use as the disconnecting device in the power ad...

Page 13: ...the computer in a point to point link The pin connections for the 9 pin D type RS232 connector and the relationship between the instrument and the RS232 control signals together with device interconnection interface is shown in Table 2 1 The instrument is configured as Data Circuit Terminating Equipment DCE 1 Power supply adaptor 2 RS232 4 IEEE488 5 USB B 6 USB A 7 Ethernet option ...

Page 14: ...struments Up to 30 instruments can be connected through a high speed data bus to the computer controller Note The length of each IEEE 488 cable must be less than 3 metres to comply with the EMC requirements Ref Data sheet 7 4 Single Unit Installation Figure 8 1 Connect an IEEE 488 connector cable assembly to the rear panel of the instrument 2 Connect the other end of the connector cable assembly t...

Page 15: ... Connector from controller computer Ref Illustration 3 Connector to rear panel of second instrument Ref Illustration 4 Connect the IEEE 488 connector on the controller computer and the other connector into the next instrument 5 Repeat this procedure for all the instruments in the system Use the Supervisor set up communications menu on each instrument to set up the required communication parameters...

Page 16: ...ATTENTION REN REMOTE ENABLE 10 11 17 DAV DATA VALID NRFD NOT READY FOR DATA NDAC NO DATA ACCEPTED 6 7 8 DIO1 DIO2 1 2 DIO3 DIO4 DIO5 DIO6 DIO7 DIO8 GND 6 GND 7 GND 8 GND 9 GND 10 GND 11 DATA STATUS BAR 3 4 13 14 15 16 18 19 20 21 22 23 24 CHASSIS FRAME CHASSIS FRAME 12 ADDRESS 1 ADDRESS 2 ADDRESS N 30 maximum controller computer ...

Page 17: ...ither a RGA or RMA Product i e PACE1000 Serial number Details of defect work to be undertaken Calibration traceability requirements Operating conditions Safety Precautions You must inform GE if the product has been in contact with any hazardous or toxic substance The relevant COSHH or in the USA MSDS references and precautions to be taken when handling Important notice Service or calibration by un...

Page 18: ...18 K0467 Issue No 4 Trademarks All product names are trademarks of their respective company The General Electric Company all rights reserved ...

Reviews: