GE C
OMPANY
D
IRECTION
5472001-1EN, R
EVISION
6
O
PTIMA
CT680 S
ERIES
AND
O
PTIMA
CT670 I
NSTALLATION
M
ANUAL
Chapter 2 - Power, Ground & Interconnect Cables
Page 103
2 –
Install
Power
Section 3.0 Console Connections
3.1
GSCB, Keyboard & Mouse Installation
1.) Route the keyboard cable under the GSCB, as shown in
.
Figure 2-3 GSCB connected to the keyboard
NOTICE
Potential for equipment damage
Never connect a mouse or keyboard with the host computer powered “ON”. Doing so
can destroy components within the host computer.
2.) Route the keyboard and mouse cables to NIO64 console.
NOTICE
NIO64 has hong cable kit option (5456816).
Refer to the Instruction, NIO Console Long Cable Kit Installation Manual,
Service Methods -
>
Installation -> Option-> NIO Console Long Cable Kit Installation (Dir 5456816-1EN)
3.) Select the local language overlay from the keyboard collector (5431062-1-XX) for your system.
PART #
DESCRIPTION
CONNECT TO
QTY
LENGTH
INCHES
MM
5366514-2 USB EXTENSION CABLE
Keyboard
1
140.16
1.18
3560
30
5366514
USB EXTENSION CABLE
Mouse
1
118.11
1.18
3000
30
5332107-2 CABLE, DVI to D-SUB VIDEO CABLE
Monitor
1
118.11
0.79
3000
20
5315370
CABLE, USB TYPE A-B
PMT media Tower,
DVD-RW/USB
external HDD
2
78.74
2000
5408703
DP to DVI cable, 3 meter
Monitor
1
118.11
1.97
3000
50
5432953-2 Power Cable, Peripheral Tower to NIO AC
Box
PMT Media Tower
1
120
1.97
3050
50
5432953-3 Power Cable, Display Monitor to NIO AC
Box
Display Monitor
1
120
1.97
3050
50
5432953-4 Power Cable, Scan Monitor to NIO AC Box Scan Monitor
1
120
1.97
3050
50
Table 2-4 GE Healthcare Supplied NIO64 Console Cables
Summary of Contents for Optima CT670
Page 205: ...CT ...
Page 206: ...206 www gehealthcare com ...