5.
ELECTRICAL RECOMMENDATIONS
a.
The distance of the cable between the GCP and the relay must be below 6.6ft (2m):
i.
If direct connection is done between the relay and the display, 1.5ft (0.5m), 3ft (1m)
or 6.6ft (2m) cables can be used.
Fig. 22 Direct connection.
ii.
If Control Panel Switch (CPS) is used between the displays and the MM300 relay,
both cables in total cannot exceed 6.6ft (2m).
Fig.23 Connection of the CPS.