GE Multilin EPM 7000 Quick Start Manual Download Page 3

CHAPTER 1: USING THE I/O OPTION CARDS                                                                                                                                                                        

MULTILIN EPM 7000 - POWER QUALITY METER – QUICK START GUIDE

1–3

• Make sure the I/O card is inserted properly into the track to avoid damaging 

the card’s components.

• For proper card fit, and to avoid damaging the unit, insert components in the       

following order:

Option  Card  1

Option  Card  2

Detachable terminal block 1

Detachable terminal block 2

Communication connection for Port 2

1.3

Configuring Option Cards 

FOR PROPER OPERATION, RESET ALL PARAMETERS IN THE UNIT AFTER HARDWARE 
MODIFICATION.

The EPM 7000 meter auto-detects any Option cards installed in it. You configure the Option 
cards through GE Communicator software. Refer to Chapter 6 of the 

GE Communicator 

User Manual

 for detailed instructions. 

Summary of Contents for Multilin EPM 7000

Page 1: ...y Using the two universal Option Card slots the unit can be easily configured to accept new I O Option cards even after installation without your needing to remove the meter The EPM 7000 meter auto detects any installed Option cards Up to two cards of any type outlined in this chapter can be used per meter FIGURE 1 1 EPM 7000 Meter Back Showing Option Card Slots and I O Card Option Card Slots Opti...

Page 2: ...ic control procedures Note Remove Voltage Inputs and power supply terminal to the meter before performing card installation 1 Remove the screws at the top and the bottom of the Option Card slot covers 2 There is a plastic track on the top and the bottom of the slot The Option card fits into this track Note Perform this procedure on an ESD safe surface to prevent damage to the EPM Meter device and ...

Page 3: ...s in the following order Option Card 1 Option Card 2 Detachable terminal block 1 Detachable terminal block 2 Communication connection for Port 2 1 3 Configuring Option Cards FOR PROPER OPERATION RESET ALL PARAMETERS IN THE UNIT AFTER HARDWARE MODIFICATION The EPM 7000 meter auto detects any Option cards installed in it You configure the Option cards through GE Communicator software Refer to Chapte...

Page 4: ... and call center as follows GE Digital Energy 650 Markland Street Markham Ontario Canada L6C 0M1 Worldwide telephone 1 905 927 7070 Europe Middle East Africa telephone 34 94 485 88 54 North America toll free 1 800 547 8629 Fax 1 905 927 5098 Worldwide e mail multilin tech ge com Europe e mail multilin tech euro ge com Website http www gedigitalenergy com multilin ...

Reviews: