CHAPTER 3: INSTALLATION
INSTALL HARDWARE
MULTILIN DGPR – INSTRUCTION MANUAL
21
Install hardware
The DGPR panel is accessible from the front. The G60 device, pushbuttons, and test
switches are mounted on the front. The terminal blocks for connections are mounted at
the back.
Figure 20 shows the front and back of the pre-wired unit with the Lexan cover over the test
switches.
Figure 20: Pre-wired unit with Lexan cover for test switches
WARNING
Perform installation without power to the DGP and DGPR, else death or serious injury
can result.
Disconnect DGP
1.
Note the locations of the wires.
2.
Disconnect all wires from the DGP and remove the DGP unit from the panel. The same
wires disconnected from the DGP will be connected to the terminals at the back of
DGPR, except for power supply alarm connections. The DGPR will be installed in the
same location as the DGP in the rack.
Mount the unit
The DGPR is a 19-inch rack-mount unit. Figure 21 shows the DGPR mounting holes.
Two people are required to mount the unit.
1.
Define the two holes on the 19-inch rack that match with pins E and F. Mark these two
holes on the rack.
2.
Lift the unit while each person holds one of the installation tools inserted in holes E or
F with one hand and the bottom surface of the DGPR with the other hand.