GE Monogram ZV950 Installation Instructions Manual Download Page 12

Installation Instructions

 8  INSTALL FILTERS

• Remove protective film on the filters.
• Tip the filter into the slots at the rear of the opening. 

Lift the filter and pull the knob forward until the filter 
rests on the slots.

• Install all 3 grease filters.

• To remove the filters, grasp the knob, push the filter 

towards the rear and tilt downwards. 

124Dia23

124Dia24

 9  FINALIZE INSTALLATION

• Remove the protective film covering the control  

panel on the front face of the hood, and any other 
packaging materials.

• Refer to the Owner’s Manual for operating  

instructions.

Note: 

While performing installations described in this book, 

safety glasses or goggles should be worn.

For Monogram

TM

 local service in your area, call  

1.800.444.1845.

Note: 

Product improvement is a continuing endeavor at 

General Electric. Therefore, materials, appearance and 

specifications are subject to change without notice.

Pub. No. 49-80095-1

 

04/08 JR

Printed in Italy

GE Consumer & Industrial

Appliances 

General Electric Company 

Louisville, KY 40225

ge.com

Summary of Contents for Monogram ZV950

Page 1: ...If you have questions call 800 GE CARES or visit our website at www monogram com Installation Instructions ZV950 36 Stainless Steel Vent Hood 124 Cover Art ...

Page 2: ...n CAUTION To reduce risk of fire and to properly exhaust air be sure to duct air outside Do not vent exhaust air into spaces within walls or ceilings or into attics crawl spaces or garages PRUDENCE Il faut prendre soin d installer un conduit vers l extérieur pour réduire le risque d incendie et pouvoir évacuer l air correctement Il ne faut pas évacuer l air dans l espace entre les parois d un mur ...

Page 3: ... 35 5 8 124Dia1 25 The supplied duct cover fits 8 ft to 10 ft ceilings The vent hood must be installed 24 min and 30 max above the cooking surface The hood installation height from the cooking surface to the bottom of the hood depends upon ceiling height Installation Height Depending on Ceiling Height 36 Min Cooking surface to bottom of hood should be 25 1 2 max for 8 ft ceiling height 25 1 2 to 3...

Page 4: ... 2 to 27 1 2 25 1 2 to 28 1 2 25 1 2 to 29 1 2 25 1 2 to 30 25 1 2 to 30 25 1 2 to 30 25 1 2 to 30 25 1 2 to 30 25 1 2 to 30 25 1 2 to 30 25 1 2 to 30 26 1 2 to 30 26 1 2 to 30 26 1 2 to 30 26 1 2 to 30 26 1 2 to 30 30 min 30 min 30 min 30 min 30 min 30 min 30 min Duct Cover ZX14SDSS SUPPLIED OPTIONAL ACCESSORIES ZX14SDSS optional stainless steel duct cover is available for ceiling heights greater...

Page 5: ...rcuit breaker or time delay fuse Wiring must be 2 wire with ground If the electrical supply does not meet the above requirements call a licensed electrician before proceeding Use metal ductwork These hoods must use 8 round duct It can transition to 3 1 4 x 12 reducing the maximum equivalent duct length to 75 feet Install a wall cap with damper or roof cap at the exterior opening Order the wall or ...

Page 6: ...lexible ducting If flexible metal ducting is used all the equivalent feet values in the table should be doubled The flexible metal duct should be straight and smooth and extended as much as possible Do NOT use flexible plastic ducting Total Duct Run Note Any home ventilation system such as a ventilation hood may interrupt the proper flow of combustion air and exhaust required by fireplaces gas fur...

Page 7: ...VE THE PACKAGING The vent hood is shipped secured to a shipping board with a shipping bracket and 4 screws Remove the duct cover parts box and other packaging Lift the hood out of the box Remove and properly discard the plastic wrapping Locate and remove 2 screws at the top of the hood Remove 2 screws at the bottom behind the filter guides on the left and right sides Remove the shipping bracket fr...

Page 8: ... 2 piece Decorative Duct Cover dimension shown for reference only Tape the template in position along the penciled line CHECK TO BE SURE THE TEMPLATE IS LEVEL Ceiling ducting If ductwork will vent straight up to the ceiling Use a level to draw a line straight up from the centerline on the template to the ceiling Measure 6 1 4 from the back wall to the centerline of a 8 1 2 hole on the ceiling Note...

Page 9: ...for Ductwork 124Dia25 View From Rear Cleats 1 x 6 Min Mounting Support 2 INSTALL MOUNTING BRACKETS This vent hood must be secured to the horizontal support or wall studs With the template taped in place use a punch to mark all mounting screw locations Drill 1 8 pilot holes at the 6 punched locations Remove the template The 4 support bracket holes must enter studs or the horizontal support Note Scr...

Page 10: ...mounting brackets Tighten lower mounting screws Tighten screws B located at the top of the mounting bracket against the hood to clamp the position Do not overtighten screws 3 INSTALL DUCT BRACKET The duct bracket must be installed against the ceiling This bracket will hold the decorative duct cover in place at the top Install the 2 small screws into the sides of the duct bracket Remove the screws ...

Page 11: ...nd wire a ground must be provided by the installer When house wiring is aluminum be sure to use U L approved anti oxidant compound and aluminum to copper connectors AVERTISSEMENT Si la maison n est pas câblée avec deux fils et un fil de terre l installateur doit installer un fil de terre Quand les fils sont en aluminium il faut prendre soin d utiliser des connecteurs aluminium à cuivre avec une pâ...

Page 12: ... film covering the control panel on the front face of the hood and any other packaging materials Refer to the Owner s Manual for operating instructions Note While performing installations described in this book safety glasses or goggles should be worn For MonogramTM local service in your area call 1 800 444 1845 Note Product improvement is a continuing endeavor at General Electric Therefore materi...

Reviews: