GE Monogram ZV750 Technical Data Sheet Download Page 2

•  T E C H N I C A L   D A T A   S H E E T  •

Pub. No. 31-14783

WARNING

POWER 

MUST 

BE DISCONNECTED BEFORE SERVICING THE APPLIANCE

CONTROl PCb

This PCB has the AC to DC power supply, microprocessor and fan 

relays and is located in the control housing in the chimney area.

TO REMOVE ANd REPlACE duCT TRANSITION  

wITh dAMPER

Push ductwork up and away from the top of the hood. Remove  

one screw on each side of the transition and replace. Be sure to 

reconnect the ductwork over the outlet and seal with duct tape.

IMPORTANT: High and Low voltage wires are routed separately. 

Reinstall wires as shipped.

NOTE: If the hood is installed for recirculating operation, the metal 

damper flaps on top of the hood exhaust outlet may be removed. 

Do not remove the duct transition. The damper is not required for 

this recirculating operation.

TO REMOVE ThE blOwER

Remove one screw on each side of the rear grease filter frame.  

Lift off the frame.

PCB

Blower 

ground 

wire

Remove 

screw

–  120V Line input 

harness

–  Lamp harness 

(both harnesses)

–  Blower motor 

harness

Main Power Board

–  Filter switch 

harness

–  User interface 

harness

–  Blower capacitor 

harness

* Purpose is to 

isolate the high-

voltage (120V) 

signals to prevent 

electrical noise 

issues.

Disconnect the motor 

ground wire. Unplug 

the wire connector.

Remove 4 screws holding the blower in place. 

NOTE: A security cable prevents the blower assembly from falling, 

but it is best to support the blower while removing the screws. To 

release the security cable, remove one screw. Replace the blower 

by reversing these steps.

Remove 

screw

Junction box

Capacitor

Reviews: