![background image](http://html.mh-extra.com/html/ge/mgi09cab3/mgi09cab3_use-and-care-manual_2198465120.webp)
120
Connective Pipe
Length (m)
< Standard pipe
length
Air purging
method
> Standard pipe
length
Vacuum pump
Vacuum pump
Additional amount of refrigerant
N.A.
Liquid side: Ø 6.35 mm (0.25")
R22:
(Pipe length - standard length) x
30 g/m
(Pipe length - standard length) x
0.32 oZ/ft
Inverter R410A:
(Pipe length - standard length) x
15 g/m
(Pipe length - standard length) x
0.16 oZ/ft
Fixed-frequency R410A:
(Pipe length - standard length) x
20 g/m
(Pipe length - standard length) x
0.21 oZ/ft
Liquid Side: Ø 9.52 mm (Ø 0.375")
R22:
(Pipe length -standard length) x
60g/m
(Pipe length -standard length) x
0.64 oZ/ft
Inverter R410A:
(Pipe length - standard length) x
30 g/m
(Pipe length - standard length) x
0.32 oZ/ft
Fixed-frequency R410A:
(Pipe length - standard length) x
40 g/m
(Pipe length - standard length) x
0.42 oZ/ft
CAUTION: DO NOT MIX REFRIGERANT TYPES.
Additional refrigerant according to pipe length
Electrical and Gas Leak Checks
Electrical Safety Checks
After installation, confirm that all electrical
wiring is installed in accordance with local
and national regulations, and according to
the Installation section.
Before Test Run
Check Grounding Work.
Measure grounding resistance by visual de-
tection and with grounding resistance tester.
Grounding resistance must be less than 4.
NOTE: This may not be required in some US
locations.
Summary of Contents for MGI09CAB3
Page 40: ...40 Modelo B Modelo C Modelo D ...
Page 101: ...101 Model B Model C Model D ...
Page 125: ...125 Notas Notes ...
Page 126: ...126 Notas Notes ...
Page 127: ...127 Notas Notes ...