![GE MDP Instruction Manual Download Page 37](http://html.mh-extra.com/html/ge/mdp/mdp_instruction-manual_131864037.webp)
GE Power Management
MDP Digital Time Overcurrent Relay
4-
5
GEK-100682D
4 INSTALLATION AND MAINTENANCE
4
4.2 PERIODIC CHECKS AND ROUTINE MAINTENANCE
In view of the vital role of relays in the operation of a power system, it is important that a periodic test program
be followed. It is recognized that the interval between periodic checks will vary depending upon environment,
type of relay, and the user's experience with periodic testing. See Chapter 5: PERIODIC & ACCEPTANCE
TESTS for periodic testing using your settings.