Instruction Manual                                                                                                                             

 

 

© GE Grid Solutions 

 

7

 

operating range. It is visible from ground 
level  behind  a  Plexiglas  window  in  the 
top cover. The limit positions are marked 
by  red  stripes  at  the  top  and  bottom. 
Please  refer  to  item  7  for  more 
information. 

2.5.

 

 

2.6.

 

Cast aluminum tank 

 

The  base  tank  is  made  of  corrosion-
proof  aluminum.  The  core  housing  (CT-
part)  has  up  to  7  independent  toroidal 
cores  enclosed  in  a  thick-walled 
aluminum  alloy  core  housing  and  is 
connected  to  the  base  through  a  stem 
and  a  ground  fault  current  carrying 
connection.  Attached  to  it  are  a  large 
terminal  box,  ground  pad  and  oil 
sampling  valve.  For  the  location  of  the 
secondary terminals and the neutral end 
of  the  HV  winding  of  the  VT  part  (for 

example H2, N…).

 

2.7.

 

External metallic parts 

The  external  metallic  parts  do  not 
require  maintenance  and  they  are 
protected against corrosion effects. 

 

3.

 

TRANSPORT, RECEPTION, 
UNPACKING AND STORAGE 

3.1.

 

  Transportation 

 

Transformers  are  shipped  in  horizontal 
position  with  the  feet  mounted  to  the 
crate/skid  and  the  head  resting  on 
damping  foam.  For  overseas  shipment, 
the  CIT  is  packed  in  wooden  crates 
designed  according  to  SEI  (cat.  4) 
specification. The crates can be stacked, 
but  no  more  than  one  crate  stacked 
over. 

3.2.

 

Reception 

 

Whether 

the 

shipment 

is 

of 

manufacturer’s 

or 

customer’s 

responsibility, the customer inspector or 
the  service  agent  must  check  the 
following on receipt of delivery: 
 
If  the  crates  show  any  signs  of  impact, 
blows or fractures, or if the transformers 
have any sign of damage or oil leakage, 
the  customer  inspector  or  the  service 
agent  in  charge  of  receipt  shall make a 
written remark on shipment documents. 
The  receipt  control,  mainly  for  the 
insulators  and  the  secondary  terminal 
box, shall be done in the presence of the 
forwarding  agent,  if  possible.  The 
remarks  regarding  the  condition  of  the 
goods  shall  clearly  state  details  of  the 
damages found at the time of reception. 
 
In  case  of  damages,  the  customer 
inspector in charge of receipt shall notify 
GE and the insurance representative. All 
contact  information  is  indicated  on 
shipment  insurance  documents.  This 
declaration  shall  be  made  within  eight 
days after receipt of the material. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for KOTEF 72.5

Page 1: ...GE Grid Solutions INSTRUCTION MANUAL MIITR102 COMBINED INSTRUMENT TRANSFORMER KOTEF 72 5 245...

Page 2: ...Instruction Manual GE Grid Solutions 2 GE Grid Solutions Av Nossa Senhora da Piedade 1021 37504 358 Itajub MG Brasil AIB 00 07 28 21 FML FES Owner revision Date Prepared Approved...

Page 3: ...as the inherent capacitance may have electric charges with voltage at the lethal level In addition a ground rod should stay on the line terminal as long as people work on the unit In the event an elec...

Page 4: ...3 3 Unpacking 8 3 4 Storage 9 4 BELLOWS BLOCKING SYSTEM AND ASSEMBLY IN THE STRUCTURE 9 4 1 Bellows blocking system 9 4 2 Assembly in the structure 10 5 CONTACT SURFACES PREPARATION 10 6 CONNECTIONS 1...

Page 5: ...to the picture below 1 Top Cover 2 Oil Level Indicator metallic bellows 3 Primary Reconnection Terminals 4 Primary terminals aluminum or copper 5 CT Headhousing current transformer part 6 Porcelain or...

Page 6: ...All secondary windings are enclosed in an aluminum box which protects them against high frequency disturbances while acting as a low voltage shielding electrode This aluminum box is extended up to the...

Page 7: ...t mounted to the crate skid and the head resting on damping foam For overseas shipment the CIT is packed in wooden crates designed according to SEI cat 4 specification The crates can be stacked but no...

Page 8: ...extremities Attention NEVER lift a transformer by its primary terminals Lift it by the lifting eyes on the transformer top All four lifting eyes must be used during lifting operation To lift the tran...

Page 9: ...tly compressed by the top cover A protection of plastic film is also put in place around the bellows to protect it against contact with the top cover In order to remove the blocking system place the t...

Page 10: ...with sandpaper 150 grain in order to eliminate the oxidation layer Scrub the contact surfaces with a metallic brush diameter of the thread 0 3mm and impregnate with grease of the type PENETROX or equi...

Page 11: ...peration 6 5 Terminal marking Primary and secondary terminal marking are done according to the specified standard please refer to the set of drawing Primary and secondary connection scheme are shown o...

Page 12: ...s taken in the factory are important as so the measurements during commissioning of each transformer The comparison between test results measured at the field allows following the evolution of each pa...

Page 13: ...tion and thereafter at four year intervals depending on availability of the 1 Ratio TTR 2 Polarity Polarity meter 3 Saturation Voltage ac voltage source Voltmeter and Ammeter 4 Ohm Resistance Wheatsto...

Page 14: ...ndfill properly licensed Other materials Industrial landfill properly licensed The disposal of oil and components contaminated with oil directly into the soil or water is prohibited For further inform...