Chapter 8 Replacement Procedures
8-13
8-2-6
Cable Replacement Procedure
8-2-6-1
Preparations
•
Shut Down and turn Off the Workstation and all its parts as described.
8-2-6-2
Cable Removal
1.) Unplug the cable from the connecting devices.
2.) Remove the cable.
8-2-6-3
Cable Installation
1.) Plug the New Cable to the same devices as the old one was connected to.
2.) Turn on the workstation and the connected device.
a.) Power Cable: Verify System is powered on.
b.) Fire wire Cable: Insert a media into the DVD Drive. Connect to the Dataflow, and verify there
is power on the DVD drive and that you are able to read from the disk.
c.) Ethernet Cables: Verify a green link light present on the Ethernet Switch, or PC.
d.) RS-232 Cable, modem: Verify iLinq connection.
CAUTION
This procedure is a general cable replacement procedure, and should be valid for Power, Fire wire,
Ethernet and RS-232 cables.