Chapter 2 - Site Preparations
2-15
P R E L I M I N A R Y
This page was intentionally left blank.
Table 2-6
Venue™ Pre-Setup Check List
Action
Yes
No
Schedule at least 2 hours for setup of the system.
Notify setup team of the existence of any variances from the basic setup.
Make sure system and probes have been subject to acclimation period.
Environmental cooling is sufficient.
Lighting is adjustable to adapt to varying operational conditions of the scanner.
Electrical facilities meet system requirements.
EMI precautions have been taken and all possible sources of interference have been
removed.
Mandatory site requirements have been met.
If a network is used, IP address has been set for the system and a dedicated network
outlet is available.