Chapter 8 - Replacement Procedures
8-177
D
IRECTION
5771498-100, R
EVISION
6
V
ENUE
™ S
ERVICE
M
ANUAL
P R E L I M I N A R Y
8-8-4
ECG Installation Procedure for Systems with Printer Installed
8-8-4-1
Tools
Appropriate Phillips screwdriver
8-8-4-2
Time Required
15 min
8-8-4-3
Preparations
1.) Shut down the Venue™ ultrasound unit, as described in
.
2.) Make sure the On/Off power switch is set to Off.
3.) Make sure the system is standing securely on a level surface, with the wheels in the locked position.
8-8-4-4
ECG Installation
1.) Remove the following covers: Lower Front eTower, Upper Front eTower, and MPB Front Metal
Door.
2.) Disconnect printer USB and Power cables.
FRU Part #
Refer to
.
•
Lower Front eTower Cover Removal Procedure
•
Upper eTower Front Cover Removal Procedure
•
MPB Front Metal Door Removal Procedure
Figure 8-193 Disconnecting Printer Cables
Summary of Contents for H45051VN
Page 477: ......