Chapter 3 Installation
3 - 1
Chapter 3
Installation
Section 3-1
Overview
3-1-1
Purpose of Chapter 3
This chapter contains information needed to install the unit. Included are references to a procedure that
describes how to receive and unpack the equipment and how to file a damage or loss claim.
How to prepare the facility and unit of the actual installation, and how to check and test the unit, probes,
and external peripherals for electrical safety are included in this procedure. Also included in this section
are guidelines for transporting the unit to a new site.
3-1-2
Contents IN chapter 3
3-1-3
Average Installation Time
Table 3-14 Contents in Chapter 3
Section
Description
Page Number
Receiving and Unpacking the Equipment
Table 3-15 Average Installation Time
Description
Average Installation Time
Comments
Unpacking the scanner
20 Minutes
Scanner wo/options
40 Minutes
Dependant on the configuration that is required