PRINTED : Mar’2009
REF NO. SM7709033-00_11
Page : 13
Part Name
D Sensor Ass’y
Operating Procedure
-
Follow step 1-7 replacing Volume Ass’y.
-
Follow step 1-5 replacing Sensor Ass’y.
-
Follow step 1-3 replacing Fan Motor F.
-
Follow step 3 replacing Heater.
1. Pull out Socket of D Sensor Ass’y.
2. Cut out Cable Tie from Evaporator
tube.
3. Remove Aluminium tape that cover D
Sensor Ass’y.
1.
After replacing D Sensor Ass’y, reverse the steps above.
Part Name
Door Switch.
Operating Procedure
* Use a small flatten screwdriver to prize
Door Switch.
1. Dig Door Switch out.
2. Pull Door Switch form Inner Box.
3. Hold recept Socket.
4. After replacing Door Switch, reverse the steps above.