GE GTDP301EL Installation Instructions Manual Download Page 3

Installation Instructions

3

CONNECTING DRYER USING 3-WIRE

CONNECTION

1. Turn off the circuit breaker(s) (30 amp) or remove the 

dryer’s

circuit fuse at the electrical box.

2. Be sure the dryer cord is unplugged from the wall.

3. Remove the power cord cover located at the lower 

back.

4. Install 3/4 in. UL recognized strain relief to power cord

entry hole. Bring power cord through strain relief.

5. Connect power cord as follows:

 

A. Connect the 2 hot lines to the outer screws of  

 

the terminal block (marked L1 and L2).

 

B. Connect the neutral (white) line to the center  

 

of the terminal block (marked N).

6. Be sure ground strap is connected to neutral (center)

terminal of block and to green ground screw on cabinet

rear. Tighten all terminal block screws (3) completely.

7. Properly secure power cord to strain relief.

8. Reinstall the cover.

L1

L2

STRAIN RELIEF

BRACKET

3/4", UL

RECOGNIZED

STRAIN RELIEF

HOT

WIRE

HOT

WIRE

GROUND

STRAP

GREEN

GROUND

SCREW

NEUTRAL

(White)

SCREWS

(3)

IF REQUIRED, BY LOCAL CODE,

INS TALL EXTERNAL GROUND

(NOT PROVIDED) TO GROUNDED

ME TAL, COLD WATER PIPE, OR

OTHER ESTABLISHED GROUND

DETERMINED BY A QUALIFIED

ELECTRICIAN.

COVER

3 #10 AWG MINIMUM COPPER

CONDUCTORS OR 120/240V 30A POWER

SUPP LY CORD KIT MARKED FOR USE

WITH D RYERS & PROVIDED WITH CLOSED

LOOP OR SPADE TERMINALS WITH

UPTURNED ENDS (NOT SUPPLIED).

3

 EXHAUST INFORMATION

EXHAUST SYSTEM CHECK LIST

HOOD OR WALL CAP

• Terminate in a manner to prevent back drafts or entry 

of birds or other wildlife.

• Termination should present minimal resistance to 

the exhaust air flow and should require little or no 

maintenance to prevent clogging.

Never

 install a screen in or over the exhaust duct. This 

could cause lint build up.

• Wall caps must be installed at least 12 in. above ground 

level or any other obstruction with the opening pointed 

down.

SEPARATION OF TURNS

For best performance, separate all turns by at least 4 ft. 

of straight duct, including distance between last turn and 

exhaust hood.

TURNS OTHER THAN 90º

• One turn of 45º or less may be ignored.

• Two 45º turns should be treated as one 90º turn.

• Each turn over 45º should be treated as one 90º turn.

     WARNING -

 IN CANADA AND IN 

THE UNITED STATES, THE REQUIRED EX-

HAUST DUCT DIAMETER IS 4 IN (102mm). DO 

NOT USE DUCT LONGER THAN SPECIFIED IN 

THE EXHAUST LENGTH TABLE.

Using exhaust longer than specified length will:

• Increase the drying times and the energy cost.

• Reduce the dryer life.

• Accumulate lint, creating a potential fire hazard.

The correct exhaust installation is YOUR 

RESPONSIBILITY. Problems due to incorrect 

installation are not covered by the warranty.

Remove and discard existing plastic or metal foil 

transition duct and replace with UL listed transition 

duct.

The 

MAXIMUM ALLOWABLE

 duct length and number of 

bends of the exhaust system depends upon the type of 

duct, number of turns, the type of exhaust hood (wall 

cap), and all conditions noted below. The maximum 

duct length for rigid metal duct is shown in the table 

below.

EXHAUST LENGTH

4" DIA.

4"

4" DIA.

4" DIA.

2-1/2"

RECOMMENDED MAXIMUM LENGTH

Exhaust Hood Types

Recommended

No. of 90º

Elb ows

Rigid

Metal

Rigid

Metal

90 Feet

60 Feet

45 Feet

35 Feet

25 Feet

0

1

2

3

4

60 Feet

45 Feet

35 Feet

25 Feet

15 Feet

Use only  for sho rt

run installations

     WARNING: 

NEVER LEAVE THE

COVER OFF OF THE TERMINAL BLOCK.

Summary of Contents for GTDP301EL

Page 1: ... or discarded remove the dryer door Inspect the dryer exhaust outlet and straighten the outlet walls if they are bent Service information and the wiring dia gram are located in the control console Do not allow children on or in the appliance Close supervision of children is necessary when the appliance is used near children Install the dryer where the temperature is above 50 F for satisfactory ope...

Page 2: ...r located at the lower back 4 Remove and discard ground strap Keep the green ground screw for step 7 5 Install 3 4 in UL recognized strain relief to power cord entry hole Bring power cord through strain relief 6 Connect power cord as follows A Connect the 2 hot lines to the outer screws of the terminal block marked L1 and L2 B Connect the neutral white line to the center of the terminal block mark...

Page 3: ...should require little or no maintenance to prevent clogging Never install a screen in or over the exhaust duct This could cause lint build up Wall caps must be installed at least 12 in above ground level or any other obstruction with the opening pointed down SEPARATION OF TURNS For best performance separate all turns by at least 4 ft of straight duct including distance between last turn and exhaus...

Page 4: ...r foil type duct to connect the dryer to the home exhaust duct It must be installed in accordance with the instructions found in Connecting The Dryer To House Vent on page 5 of this manual Do not terminate exhaust in a chimney a wall a ceiling gas vent crawl space attic under an enclosed floor or in any other concealed space of a building The accumulated lint could create a fire hazard Never termi...

Page 5: ...d the duct to its full length Allow 2 of duct to overlap the exhaust pipe Cut off and remove excess duct Keep the duct as straight as possible for maximum airflow 4 Secure the duct to the exhaust pipe with the other clamp DO ELBOW HIGHLY RECOMMENDED ELBOWS HIGHLY RECOMMENDED DON T DO NOT USE EXCESSIVE EXHAUST LENGTH DO NOT CRUSH FLEXIBLE EXHAUST AGAINST WALL DO NOT SIT DRYER ON FLEXIBLE EXHAUST 7 ...

Page 6: ...R RIGHT SIDE OF CABINET Preassemble 4 elbow with 4 duct Wrap duct tape around joint Insert duct assembly elbow first through the side opening and connect the elbow to the dryer internal duct CAUTION Be sure not to pull or damage the electrical wires inside the dryer when inserting the duct Cut the duct as shown and keep portion A 9 A B FIXING HOLE Through the rear opening locate the tab in the mid...

Page 7: ... on the side from which the door was removed REMOVE THE BOTTOM SCREW FROM EACH HINGE ON THE DRYER FACE LOOSEN THE TOP SCREWS FROM EACH HINGE ON THE DRYER FACE HALF WAY MOVE THE DOOR IN AND DOWN UNTIL THE TOP HINGE AND THE BOTTOM HINGES ARE RESTING ON THE TOP SREWS INSERTED IN STEP 1 SECURE EACH HINGE AT THE BOTTOM AND TIGHTEN THE TWO TOP SCREWS OF EACH HINGE Apply duct tape as shown on the joint b...

Page 8: ...and until firmly seated 4 Insert the filter screen in the coupling of the washer s inlet hose If a rubber flat washer is already in place remove it before installing the filter screen Attach this coupling to one male end of the Y connector Tighten by hand until firmly seated 5 Ensure the rubber flat washer is in place and attach the dryer s long inlet hose to the other male end of the Y connector ...

Reviews: