P/N 1069668 • REV 1.0 • ISS 22FEB10
3 of 10
Figure 1: Terminal setup diagram
A terminal program is required to make the software connection to the GE-DS-
242-PoE Managed Switch. Windows' Hyper Terminal program is a good choice.
The Hyper Terminal program can be accessed from the Start menu.
1. Click
START
, then
Programs/Accessories
and then
Hyper Terminal
.
2. When the following screen appears, make sure that the COM port is
configured as:
• Baud :
57600
• Parity
: None
• Data bits
: 8
• Stop
bits :
1
• Flow Control : None
Figure 2: COM1 properties window